A 10 kV epoxy-cast current transformer is built from five functional layers: a magnetic core, a secondary winding, a primary conductor, an electrostatic shield and the cast-resin body that locks them together. On a 600/5 A unit the secondary carries 120 turns. Any one of those five layers decides whether the unit passes its routine tests and how it behaves after ten years in service.

What are the five layers inside a current transformer?

Look at a finished CT and you see a casting, two primary terminals and a small secondary terminal block. The working parts are sealed inside, in a fixed order, because each layer has one job and each job is tied to a test the buyer will eventually see. The breakdown below is the one used when a unit is opened for failure analysis; read it as an acceptance checklist rather than a description.

Bushing type current transformer, 50 to 300 A window unit with red epoxy body and secondary terminal block
LayerMaterialFunctionWhere it fails first
Magnetic coreGrain-oriented silicon steel or microcrystalline strip, laminated or woundCarries the flux that couples primary to secondary; sets the knee point and the accuracy limit factorSaturation on high through-fault current; loose or shorted laminations
Secondary windingEnamelled copper, from about 10 to over 1,000 turns depending on ratioProduces 5 A or 1 A proportional to primary current and drives the connected burdenWinding resistance drift; insulation faults to core or shield
Primary conductorCopper bar or stud cast into the body, or the customer's own busbar or cable in a window typeCarries full load and short-circuit current; fixes the number of primary turnsHot spots at terminals; thermal or dynamic rating exceeded
Electrostatic shieldThin copper or aluminium foil between primary and secondaryIntercepts capacitive current, fixes stray capacitance and gives surge energy a path to earthPinholes and gaps in the foil; discharge at shield edges
Cast-resin bodyFilled epoxy, vacuum castInsulation between windings and to earth, mechanical support, creepage and sealingVoids and cracks; tracking on polluted surfaces

The bushing or window form in the photograph above is the simplest of the family: the core and secondary sit in a ring, and the primary is whatever conductor the installer passes through the opening. One pass through the window is one primary turn. That single fact explains most of the ratio and saturation questions that follow, and it is also why window units are the only practical choice for retrofitting a cable that cannot be disconnected.

How does the core set both accuracy and saturation?

The core is the only layer that behaves differently for metering and for protection, which is why most medium-voltage CTs carry two cores in one casting. A metering core runs at low flux density so that ratio and phase error stay inside the class limits from 5 % to 120 % of rated current, or from 1 % on an S class. A protection core is allowed a coarser class such as 5P or 10P but must not saturate before the fault current it is expected to see; the accuracy limit factor states how far above rated current that promise holds.

That trade-off is why one 600 A primary can carry a 10 VA 0.5 core and a 15 VA 10P10 core with different amounts of iron and copper behind each. Undersizing the protection core is the quiet error: the unit passes ratio and polarity tests at rated current, then under a close-in fault the secondary waveform distorts, the relay sees less current than the primary carries, and the trip is late or missing. Undersizing the metering core is noisier and easier to catch, because the error drifts once load rises above roughly half rating.

Why does a 600/5 A unit need 120 secondary turns?

Ampere-turns balance is the whole mechanism: the primary ampere-turns equal the secondary ampere-turns in an ideal unit. In a bar or window design the primary is a single pass, so the number of secondary turns is simply the ratio. A 600/5 A CT therefore needs 120 secondary turns and a 50/5 A unit needs 10. Voltage class does not enter that arithmetic, which is why a 10 kV and a 35 kV unit of the same ratio can look very different outside and be nearly identical inside.

Rated ratioPrimary turns (bar or single pass)Secondary turns requiredSecondary current at rated primary
50/5 A1105 A
100/5 A1205 A
300/5 A1605 A
600/5 A11205 A
600/1 A16001 A
800/1 A18001 A

The choice of secondary current moves the turns count by a factor of five. A 600/1 A unit needs 600 turns instead of 120: more copper, higher winding resistance and a different burden calculation. The reward is that the same VA is delivered at one fifth of the current, so the cable from the CT to the panel can run much further before lead resistance eats into accuracy. On a compact 11 kV panel with short runs to the meter, 5 A is usually the cheaper answer.

Two practical consequences follow. First, turns count is what makes a low-ratio unit bulkier inside its casting than its current rating suggests, and it changes the secondary resistance the burden has to be matched against. Second, a winding with more layers of thinner wire carries more voltage stress between layers, so the layer insulation and the partial-discharge test matter more on the low-ratio and 1 A versions than on a 600/5 A frame.

Bar, post or window: how does the primary get into the casting?

Three arrangements cover almost every medium-voltage order. In a window or through-core design the primary is not part of the product: the customer's busbar or cable passes through the opening, so the rating is limited by window size and by how much copper the installer can fit. In a post or bar type the primary is a copper bar cast into the body with a terminal at each end, which fixes the ratio and removes the installer's freedom to get it wrong. In a wound type the primary is a few turns of heavy conductor, used where a very low ratio would otherwise need an impractical number of secondary turns.

LA-10 indoor post type current transformer shown isolated, with cast-in primary terminal and secondary stud plate

The choice is mechanical before it is electrical. A retrofit onto an energised cable can only use a window or split-core design, because the conductor cannot be opened; a new panel with a busbar run is better served by a bar-primary unit the builder can torque to a stated value. The LA-10 post-type frame is the second case: one casting, cast-in primary terminals, secondary studs on a plate, sized for a 3-12 kV cubicle. Where the drawing shows a post-type CT but the cubicle is built for a cable termination, the order is wrong no matter how good the internals are.

What does the electrostatic shield actually do?

Between the primary conductor and the secondary winding sits a thin metal foil taken to a defined potential, normally earth. Its first job is to intercept the capacitive current that the primary voltage would otherwise push into the secondary circuit. Without it the secondary carries a small power-frequency component that is not proportional to the primary current, so the ratio error stops being a function of current alone and starts to move with system voltage.

The second job is transient behaviour. A shield gives the high-frequency content of a switching or lightning surge a low-impedance route to earth instead of letting it couple into the secondary winding and on into the relay. On a unit feeding a differential or distance scheme, an intermittent shield connection appears as an error that shows up at one substation and not another, in CTs from the same batch and the same drawing.

What does the cast body have to survive?

The epoxy is not packaging. It is the insulation between primary and secondary, between phases and to earth, and it is also the structure that holds the core in place against short-circuit forces. Vacuum casting is used because air is the enemy: a void inside the insulation is where partial discharge starts, grows and eventually perforates the wall. That is why the partial-discharge test, not the power-frequency withstand test, is the one that finds a badly cast unit.

LA-10 indoor current transformer epoxy casting, mounting plate and secondary terminal studs on a plain background

The body also has to take the thermal shock of a short-time withstand and then years of daily load variation without cracking at the flange where the casting meets the mounting plate. Cracks matter because they admit moisture, and moisture in a CT is not a slow problem: insulation resistance falls, discharge rises, and the unit fails the next site test. Indoor units in a dry switch room are forgiving. Outdoor units on a coastal or dusty site are not, and there the creepage and surface condition start to dominate the specification rather than the internal build.

Which internal faults show up first in a factory test?

Internal faults surface in a fairly fixed order, and each one carries a different commercial consequence. Mapping the test result to the layer responsible is what lets a buyer challenge a supplier's explanation instead of accepting a re-test and a new date.

Test resultLayer most likely responsibleWhat it costs
Partial discharge above limitVoids in the casting, or a damaged shield edgeRe-casting; weeks added to delivery, not days
Ratio error outside class at low currentCore grade or annealing, or the wrong tap brought outCore replacement; the rest of the batch is suspect
Phase displacement out of limitWinding distribution, or shield influence on the coreMetering accuracy at stake for the whole order
Polarity reversedSecondary wound or terminated the wrong way roundProtection misoperation on first energisation
Secondary resistance highToo few turns or a smaller wire section than the burden needsLead voltage drop; the meter under-reads at full load
Withstand or insulation resistance failureMoisture, a crack, or a void through the wallUnit scrapped; site test failure if it ships

The expensive faults are the ones that pass and fail later. A polarity error on a protection core is the classic case: correct ratio, correct withstand, correct discharge level, and the mistake only appears when the relay sees a reverse-direction fault and does not operate. On site that means re-testing every core in the panel, a new commissioning window and a delay to energisation that has nothing to do with the price of the CT. Testing polarity before energisation is cheaper than discovering it afterwards.

What should the RFQ state about what you cannot see?

Most enquiries describe the outside: voltage class, ratio, class and VA. The internal decisions are left to the supplier, and that is where two bids that look identical start to diverge. Six items are worth writing as requirements rather than wishes.

  • Core material and core type for each core, with the accuracy class and accuracy limit factor that core must hold — not only the ratio.
  • Rated continuous thermal current, rated short-time thermal current with its duration, and rated dynamic current, stated against the site fault level so the supplier has to confirm the frame. On the 600 A LA-10 frame the data sheet gives 32 kA for 1 s and 80 kA dynamic.
  • Insulation level, and the partial-discharge limit together with the test voltage it applies at. A limit without a test voltage means nothing.
  • Presence and earthing arrangement of the electrostatic shield, especially where the secondary feeds a differential or distance scheme.
  • Secondary terminal arrangement and the marking of each core, so the panel builder wires to the drawing instead of guessing which core is which.
  • Documents: routine test report per unit, type test report for the frame, and an outline drawing with window or terminal dimensions for approval.

Two of those six settle most disputes. The accuracy limit factor catches protection cores that were sized on ratio alone, and the discharge limit with its test voltage catches units cast to a cheaper internal standard. Neither is visible in a photograph and neither can be checked once the unit is sealed. Buyers comparing frames across suppliers will find the same logic applied in the medium-voltage CT specification checklist, and the ratio arithmetic is set out step by step in choosing a CT ratio.

Where Nahu Group Fits

Nahu Group casts epoxy current transformers from 0.66 kV to 40.5 kV. The LA-10 indoor frame covers 3-12 kV panels with rated primary currents from 5 A to 1,000 A, metering cores in 0.2S or 0.5S combined with 10P10 or 10P15 protection cores, 5 A secondary as standard and custom ratios on request. Units ship with routine test reports, and type test reports for the frame are available for approval packages. For the wider range, start at the current transformer product page; for protection cores in a 10 kV feeder panel the LZZBJ9-10 post-type CT is the usual starting point.

To get a configuration, send the single-line diagram or panel drawing, the ratio and class for each core, the burden in VA, the site fault level and the quantity. If the CT replaces an existing unit, add a photograph of the nameplate and the window or terminal dimensions — that detail usually decides whether a standard frame fits or a new casting is needed.

If you are still weighing a window unit against a wound-primary design, the bushing current transformer comparison covers that decision from the installation side.

Frequently asked questions

How many turns does a 600/5 A current transformer have?

One hundred and twenty on the secondary, when the primary is a single bar or a single cable pass. Ampere-turns balance fixes the number: secondary turns equal primary turns multiplied by the ratio, so one times six hundred divided by five gives 120. Move the secondary to 1 A and the same 600 A primary needs 600 turns.

What are the main parts inside a current transformer?

Five: a laminated or wound magnetic core, a copper secondary winding, a primary conductor or window, an electrostatic shield between primary and secondary, and the epoxy casting that insulates and supports the assembly. Metering and protection duties are normally served by two separate cores inside the same casting rather than one shared core.

Why is the core laminated rather than solid steel?

Eddy currents. A solid core would circulate large currents inside the steel, heat up and distort the transformation. Thin insulated laminations, or a wound strip, break those paths. The grade and the annealing of the strip also set the knee point, which is what decides when the unit saturates during a fault.

Can a cast-resin CT be opened for inspection?

No. The epoxy is the insulation, so opening the unit destroys it. Internal condition is proved by tests instead: partial discharge at 1.2 times the highest voltage for equipment divided by root three, ratio and polarity on every core, secondary winding resistance and a power-frequency withstand. Field checks repeat only the external ones, which is why the factory reports matter.

What causes partial discharge inside a CT?

Voids, delamination and sharp shield edges. Air trapped in the casting breaks down at a far lower stress than epoxy, so discharge starts in the bubble and erodes the wall around it. Incomplete vacuum, contaminated resin and damaged foil are the usual causes; moisture entering through a later crack produces the same signature on a site test.

Does a higher accuracy class mean a better CT?

Not on its own. A 0.2S metering core is accurate at normal load but saturates early, which makes it useless for protection. A 5P20 protection core is coarse for billing but stays linear through a fault. The useful question is which core does which job, and whether the accuracy limit factor matches the fault level at that point in the network.