CT polarity is the terminal convention that fixes which end of the secondary winding is S1 when current enters the primary at P1, and one reversed core rotates the current seen by the scheme through 180 degrees. Magnitude-only functions survive that; directional, differential, restricted earth fault and metering functions do not, which is why the error is usually found by a relay that trips at the wrong moment rather than by a test sheet.
The convention is defined, not customary. IEC 61869-2 sets the P1, P2, S1 and S2 terminal markings for inductive current transformers and the polarity relationship they must satisfy, so a CT that follows the standard can be wired from the drawing without further argument.
How Additive and Subtractive Polarity Differ
With subtractive polarity, the standard case, current entering the primary at P1 produces secondary current that leaves S1 into the external circuit and returns through S2. Additive polarity reverses that relationship, and it exists mainly for historic and some bushing-type applications where the secondary leads were brought out the other way.
Two consequences follow for a project. First, additive and subtractive CTs cannot be mixed inside one protection set without correcting the wiring, even when the ratio, class and burden are identical. Second, the nameplate is the only reliable source: a Chinese nameplate usually states the convention explicitly, and a nameplate that stays silent should be treated as a question for the supplier, not as an invitation to assume.
The physical side is just as easy to get wrong. Polarity is defined relative to the P1 end, so a CT installed with P2 facing the busbar has its polarity reversed at the primary, whatever the terminal box says. On cable-mounted and retrofit units the P1 marking is a cast arrow, and it is worth a photograph during installation because it is invisible once the box is closed.
How to Check CT Polarity With a Battery and a Meter
The direct current flick test needs a 1.5 to 9 V battery and a centre-zero DC millivoltmeter or an analogue multimeter, and it takes a minute per core. Connect the battery positive to P1 and negative to P2, connect the meter positive to S1 and negative to S2, then make and break the primary circuit with a switch.
- On making the circuit, a positive kick means the core is subtractive and the S1 marking is correct.
- On breaking the circuit, the meter kicks the other way. That reversal is normal; only the make direction is read.
- A positive kick on break and a negative kick on make means the core is additive, or the meter leads are reversed. Swap the meter leads and repeat before writing anything down.
- A dead core, or a kick that will not settle, points to an open secondary or a shorted turn, not to a polarity question.
The second check is a primary injection with a resistive load, using a phase angle meter or the relay's own measurement menu to compare the secondary current angle with the reference phase voltage. This is the check that catches a fused or shorted core and a wiring error in the same pass, and it is the one to repeat after any modification to the secondary circuit.
What One Reversed Core Does to Each Protection Function
The damage is not uniform, which is why a scheme can pass a functional test and still misoperate in service. The table below is the one worth carrying to the commissioning meeting.
| Function | Effect of one reversed core | How it shows up |
|---|---|---|
| Non-directional overcurrent (50/51) | None on magnitude; the element still sees the current it expects | Nothing, which is why the error survives routine testing |
| Directional overcurrent (67) | Direction inverted for that phase, so forward faults are blocked and reverse faults are cleared | Trips on a healthy feeder during a fault elsewhere |
| Differential, busbar or transformer (87) | Currents add instead of cancel, producing apparent differential current at normal load | Spurious trip at load or on energisation; refusal on an internal fault if the setting is raised to stop it |
| Restricted earth fault (87N) | Neutral and phase currents no longer oppose each other | No operation on an earth fault inside the zone |
| Negative sequence or unbalance (46) | A permanent 180 degree error in one phase reads as continuous negative sequence current | Persistent alarm, or a trip on a healthy feeder |
| Metering and energy | One phase contributes negative power, so the total is understated | Energy accounts that do not reconcile; a meter reading low but plausible |
Why the Error Recurs on Real Projects
It is rarely a factory defect. The common causes are a CT mounted with P2 toward the busbar, a secondary cable landed on S2 at the terminal block while the star point was formed on S1, and a replacement core from a later batch wired to the drawing of the older one. Retrofit work adds a fourth: CTs opened and re-closed around a cable during a cable replacement, then closed with the polarity arrow pointing the wrong way.
The commercial consequence is not the cost of the rework. A differential scheme that trips on load during energisation costs a day of switching and an investigation; a directional element that blocks a genuine forward fault is a safety finding at the utility, and findings of that kind delay acceptance of the whole substation. Both are avoidable with a test that takes minutes per core.
It is worth writing the check into the commissioning plan rather than leaving it to the protection engineer's habit, and worth pairing it with the primary injection test procedure, which proves ratio and wiring at the same time.
What to Write in the RFQ and the Datasheet
Polarity is a specification item, not a detail to be discovered on site. Ask for it in these terms:
- Terminal markings to IEC 61869-1 and IEC 61869-2, with P1 and S1 marked on the casting and repeated on the nameplate.
- The polarity convention stated on the nameplate and on the routine test certificate, for every core.
- A core schedule that identifies metering and protection cores separately, with ratio, class, burden and accuracy limit factor.
- A secondary terminal arrangement drawing showing the star point and the intended earth point, so the panel builder and the site team work from one document.
- A polarity test result per core in the routine test report, not a statement that the CTs are "standard".
Two of those items decide how the scheme behaves: the core schedule and the terminal arrangement. A supplier who returns both, marked up against your single line diagram, has removed most of the risk before the first crate is opened. The treatment of the star point itself is covered in our note on single-point earthing of the CT secondary, and the same terminal discipline applies to class PX cores in differential schemes.
Where Nahu Group Fits
Nahu Group manufactures indoor current transformers for 3 to 12 kV switchgear, including the LZZBJ9-10 post-type unit and the LA-10 indoor CT, with metering cores in 0.2S or 0.5S and protection cores in 5P or 10P and custom ratios on request. Both are epoxy-cast, maintenance-free units with the terminal markings cast into the body.
To get a configuration confirmed, send the system voltage, the ratio and core list, the burden and class per core, the panel or bay the CT sits in, and the polarity convention your protection settings assume. We will return the datasheet, the terminal arrangement drawing and the routine test report for the batch. The full current transformer covers the other ratios and voltage classes if the first enquiry does not settle the selection.
Frequently Asked Questions About CT Polarity
Does reversed CT polarity affect overcurrent protection?
For a plain non-directional overcurrent element, no. The element measures magnitude, and a 180 degree shift does not change magnitude. It does change directional, differential, restricted earth fault, negative sequence and metering functions, and those are usually in the same scheme, which is why a passing overcurrent test proves very little.
What does subtractive polarity mean on a CT nameplate?
It means current entering the primary at P1 produces secondary current that leaves S1 and returns through S2. Additive polarity reverses that. Subtractive is the standard arrangement in IEC-marked CTs, and where a nameplate states it, the terminal marking can be trusted without further interpretation.
Can a reversed CT be corrected in the relay settings instead of rewiring?
Some numerical relays allow a channel to be inverted, and that will make one protection function work again. It leaves the metering core reversed, hides the wiring error from the next engineer, and breaks any other device sharing the core. Correct the wiring and record the polarity test result instead.
Where should the star point of a three-phase CT set be?
The usual convention is S1 toward the protected object and the star point formed on S2, then earthed at one point only, normally at the terminal box or the panel. What matters more than the convention is that the drawing, the terminal block and the test record all use the same one.
How often should CT polarity be rechecked?
After installation, after any work on the secondary circuit, and after a cable or CT replacement. A core that was correct at the factory can be reversed by a terminal block rewire, and a scheme that was commissioned two years earlier is not evidence about the wiring that exists today.
Sources and Further Reading
- IEC 61869-2:2012 — Instrument transformers, Part 2: Additional requirements for current transformers — the terminal markings P1, P2, S1 and S2 and the polarity requirements this article bases its wiring rules on
- IEC TR 61869-100:2017 — Instrument transformers, Part 100: Guidance for application of current transformers in power system protection — how protective cores are applied in directional and differential schemes, including the consequences of a reversed connection
- IEC 61869-1:2023 — Instrument transformers, Part 1: General requirements — the common requirements for marking, ratings and documentation that apply across current and voltage transformers
Published Nov 12, 2026 · Nahu Group (NAHU Electric Technology)