Place a fault indicator at every point where the feeder can be split, not at regular intervals along it. One set at the substation exit, one on each tee leg, one either side of each sectionalizing device and one at each cable head gives a 30 km rural 11 kV feeder four to six sets, and cuts a fault patrol from the whole feeder to one or two spans.
What follows is a placement plan to mark on the single-line diagram before an order is raised: which positions carry the location logic, how many sets each feeder shape needs, what a misplaced unit costs, and what to write into the RFQ. Those positions are served by the fault indicator family.
What the flag proves, and what it does not
The indicator does not measure distance to the fault. It records that fault current passed this point and holds a flag until normal current returns, so location comes from the boundary between the last flagged set and the first unflagged set downstream. A set that fault current cannot reach — on the trunk above a tee, or on the line side of a cable transition — stays silent through a real fault, which reads as "no fault here". For the flag and reset logic, see how a faulted circuit indicator works.
The four positions that earn their cost
Every set should bracket something. In practice four positions do the work.
| Position | Segment bracketed | Lost without it |
|---|---|---|
| Substation exit, feeder way | This feeder versus upstream | A healthy feeder is patrolled |
| Each leg of a tee-off | That branch alone | Branch fault patrolled along the trunk first |
| Either side of a switch | Section between two devices | The longest unbracketed section stays in patrol |
| Cable head at the transition | The cable run and terminations | Underground fault hunted along the line |
On a three-set budget: exit, both sides of the sectionalizing point, then each tee. One set at the exit is an indicator, not a location system.
Branch tees, sectionalizing points and cable heads
A tee has legs, and each leg needs its own set downstream of the joint. Fit one set above a three-leg tee and a fault on any branch flags identically. On a sectionalizing switch, a set on the source side proves the fault is downstream, but not which side of the next switch it lies on.
A pole with a load-break switch is a natural splitting point, and the indicators belong on the conductors either side of it, not on the crossarm. Where the device is a load-break switch used to isolate a faulted section, both sides are monitored; an isolating device needs one, since the next tee brackets the rest.
Cable heads break the same logic. A clamp on the last conductor sees through-faults into the cable but not a cable fault fed only from the remote end, so the cable side needs a device in the termination or joint bay. These are specified by compartment, not conductor diameter: the 2DG indicator for cable junction boxes and ring network switchgear is compared against the panel type, never a line clamp.
Spacing on long rural runs, and how many sets to order
Beyond the switching points, spacing is set by patrol time: a segment should be walkable and provable inside the crew's working window. On 11 kV rural construction that lands at roughly 1 to 3 km, tighter at river and forest spans.
| Feeder shape | Typical sets | Positions |
|---|---|---|
| Radial, 5-10 km, no tees | 2-3 | Exit; one mid-run point |
| Radial, 2-3 tees, 15-25 km | 4-6 | Exit; each tee leg; mid-trunk |
| One sectionalizing switch, 25-35 km | 5-7 | Exit; both sides; tees |
| Mixed overhead and cable | Add 1-2 cable units | Cable heads; one inside the RMU |
A combined unit such as the JDG-Y multifunctional overhead line indicator puts short-circuit, earth-fault and transient detection on one clamp — worth specifying at the exit and at tees.
What a wrong position costs commercially
A bad position does not cost the unit price; it costs the patrol it fails to shorten. One extra hour of a two-person crew with a vehicle, repeated a few times a year, exceeds the price of the set that would have removed it — before outage minutes count.
- Silent unit, wrong conclusion. A set that cannot see the fault leaves a clean feeder and no explanation, so the crew opens switches and healthy customers go dark.
- Duplicate sets. Two units on one trunk bracket the same segment; the second is usually the set meant for a branch.
- Wrong threshold. A tee sees load current from the whole downstream feeder, so a tail-end threshold flags on standing imbalance — covered in setting earth-fault thresholds.
- Rework after energisation. Moving a clamp means a second live-line visit and permit.
What to write into the RFQ and datasheet
A placement plan is only usable if the supplier receives it. Put the positions in the RFQ, not just the quantity: position decides sensing principle and threshold range. State, at minimum:
- Numbered positions against the diagram: exit, tee legs, either side of each switch, cable heads.
- Fault types per position: short circuit only, or with earth fault, plus any transient point.
- System voltage, earthing arrangement, standing residual current per position.
- Conductor range per clamp; live-line or outage installation.
- Documents: type test reports, routine test report per unit, threshold-setting instructions, marked-up position list.
Where Nahu Group Fits
Nahu Group manufactures indicators for these positions: line-mounted units in two-in-one, four-in-one and six-in-one configurations, including the JDX two-in-one unit for overhead feeders, plus cable and panel types. This rural feeder automation project puts its indicators at the sectionalising points, as this page does.
For a configuration, send the diagram with positions marked, system voltage and earthing, measured residual current per position, conductor range and quantity. Units are set against that data before shipment, so a tee threshold is not a tail-end threshold.
Frequently Asked Questions
Where on the pole should an overhead indicator be clamped?
On the phase conductor, on the span side the unit is meant to bracket, clamp fully closed, display facing the patrol route. Not the crossarm, not a jumper carrying current from two directions, not the earth conductor. Mechanical seating matters more than height.
Do I need indicators on both sides of a sectionalizing switch?
Yes where the switch is opened to isolate a fault, because the flags either side tell the crew which section to patrol. A downstream set alone narrows the search only after the switch has been opened, which is the step the indicator was bought to avoid.
Can one unit cover both the overhead line and the cable?
No. The overhead unit clamps a bare conductor and harvests power from line current; the cable unit sits in a termination, joint bay or ring main unit, sized to the compartment. A cable fault downstream of a transition needs its own device.
How far apart should sets be with no switches on the line?
Space them by walkable patrol segment, typically 1 to 3 km on 11 kV rural construction, and tighten at river crossings and forest where access is slow. The indicator does not set the distance; the time needed to prove a segment clear does.
Is a four-in-one unit worth it at every position?
Usually not. Put combined short-circuit, earth-fault and transient detection where both fault types must be caught at one point — the feeder exit and tee legs. On a mid-run span where only short-circuit location is needed, a two-in-one unit does the same job for less.
Sources and Further Reading
- IEC 62271-1:2017 — Common specifications for high-voltage switchgear — service conditions and clearances the position must respect.
- IEC 60071-1 — Insulation co-ordination, Part 1 — basis for phase and earth clearance on a crossarm.
Published Nov 16, 2026 · Nahu Group (NAHU Electric Technology)