A potential transformer's ratio is a voltage ratio: U1/U2 = N1/N2. For a 10 kV/100 V unit the ratio is 100:1, so the primary carries 100 turns for every turn on the secondary — a 200-turn measuring winding sits under a 20,000-turn primary. Every other figure on the datasheet, including how far the finished unit may legally sit from that number, follows from this one line.

Red epoxy-cast indoor JDZX9-10 voltage transformer with two winding blocks and a clear-covered secondary terminal box on a brass base plate

Buyers meet the ratio twice: once as a nameplate line such as 10000/√3 / 100/√3 / 100/3, and again as a multiplier inside a meter or a relay setting. If the two disagree, the error is not theoretical. It is either a revenue leak on every kWh the feeder delivers or a protection threshold that will not trip the one time it matters.

What the ratio line on the datasheet is telling you

A three-value ratio line is not one ratio with tolerances. It is three separate windings on one core, and each value belongs to a different winding. On the JDZX9-10 the line reads 10000/√3 / 100/√3 / 100/3: the primary winding is rated 5,774 V to earth, the measuring winding is 57.7 V, and the residual winding is 33.3 V. Two ratios come out of that single line — 100:1 for the winding that feeds the meter, and 173:1 for the winding that feeds the earth-fault element.

Read the line left to right and the arithmetic is visible: the measuring ratio is 5,774 ÷ 57.7 = 100, and the residual ratio is 5,774 ÷ 33.3 = 173.2. The second number is the first multiplied by √3, which is why the residual winding always carries roughly 58% of the measuring turns. Nothing about it is arbitrary; it is the turn count needed so that three residual windings in series, in a broken delta, add up to the 100 V a relay is designed to see.

Two secondary conventions that differ by 1.732

The same primary voltage produces two very different ratios depending on whether the secondary is rated for a line voltage or a phase voltage. Choose the wrong convention and the meter reads 73% high or 42% low, with nothing on the nameplate to flag it. The table below covers the combinations that reach a real requisition.

Primary windingSecondary windingRatioWhere the convention is used
11/√3 kV = 6,351 V100/√3 V = 57.7 V110 : 1Phase-to-earth unit in an earthed 11 kV system, metering and residual in one frame
11 kV = 11,000 V100 V110 : 1Phase-to-phase unit in a V/V set, two units across three line voltages
11/√3 kV = 6,351 V100/3 V = 33.3 V190.5 : 1Residual winding, three windings summed in broken delta
33/√3 kV = 19,053 V100/√3 V330 : 1Phase-to-earth unit on a 33 kV system
33 kV = 33,000 V100 V330 : 1Phase-to-phase unit, V/V set on a 33 kV feeder

The first two rows carry the same 110:1 ratio from different primaries, which is exactly why a 100 V unit and a 100/√3 V unit cannot be swapped by anyone reading the ratio alone. The winding that produces 100 V from 11 kV is the one that must not be used where the scheme expects 57.7 V. If the drawing says 100/√3 V and the store room issues 100 V, every phase voltage on the panel will read 1.73 times too high.

From system voltage to a turns count in four steps

The calculation itself does not need a program. Four steps take a single-line diagram to a number a winding shop can work to.

  • Fix the primary winding voltage. Take the voltage that appears across the winding, not the system voltage on the drawing title. In an earthed system a phase-to-earth unit sees the line voltage divided by √3, so an 11 kV feeder gives 6,351 V.
  • Fix the secondary convention. 100 V for line-to-line duty, 100/√3 V for phase-to-earth duty, 100/3 V for a residual winding. This choice is set by the meters and relays already on the panel, not by preference.
  • Divide to get the ratio. K = U1/U2. Keep one decimal place: 6,351 ÷ 57.7 = 110.1, and 6,351 ÷ 33.3 = 190.5.
  • Multiply by the chosen secondary turns. N1 = K × N2. A 200-turn measuring winding needs 20,000 primary turns at K = 100; the same core, wound for the residual ratio of 173, needs a 116-turn winding.

Step four is where the design freedom sits. The secondary turn count is a manufacturing choice — 200 turns is common on medium-voltage cast-resin units because it keeps the winding compact and the wire size workable — and the primary count simply follows. Nothing in the ratio changes if a shop chooses 150 turns or 250 instead, but the physical winding does, and so does the window the core has to fit into.

Worked example: a 10 kV unit with a residual winding

Take the JDZX9-10 as a real case, since it publishes both a measuring and a residual winding on one frame. The ratio line is 10000/√3 / 100/√3 / 100/3, insulation level 12/42/75 kV, and the measuring core is offered in classes 0.2, 0.5, 1 and 3 with rated outputs of 30, 60, 180 and 500 VA. Work the turns out against a 200-turn measuring winding and the three windings line up as follows.

WindingRated voltageRatio to the primaryTurns on the secondary
Primary10,000/√3 = 5,774 V—20,000
Measuring100/√3 = 57.7 V100 : 1200
Residual100/3 = 33.3 V173 : 1116

Two consequences follow from that table and both show up in procurement. The residual winding is a shorter winding on the same core, so its ratio is not a second opinion on the measuring winding — a ratio test on the residual side will read 173:1 and that is correct, not a defect. And because the two windings share a primary, a unit quoted with only one ratio value on the datasheet is either a single-winding unit or a datasheet that has lost a line, and the buyer should ask which.

The same ratio at 35 kV: twice the turns, same class

Red epoxy-cast JDZX9-35 indoor voltage transformer with a ribbed 35 kV primary bushing stack above the winding block

Move the same design to a 35 kV system and the ratio arithmetic does not change, only the numbers it is fed. A JDZX9-35 publishes 35000/√3 / 100/√3 / 100/3, so the measuring ratio becomes 350:1 and the residual 606:1. Hold the secondary at 200 turns and the primary goes to 70,000 turns; the residual winding stays at 116.

What changes far more than the turns is the insulation. The 10 kV unit is rated 12/42/75 kV; the 35 kV unit is rated 40.5/95/200 kV, and that is what drives the height of the casting and the depth of the bushing stack you see on the unit. A specification that copies a 10 kV datasheet and edits the ratio will produce a unit that passes a ratio test and fails an impulse test. Ratio is roughly 3.5 times harder at 35 kV; insulation is roughly 2.7 times the withstand voltage, and the second number is the one that costs money.

Why the measured ratio sits below the nameplate figure, and how to check it

A PT is not wound to the exact ratio printed on its nameplate. Under burden, the magnetising current and the winding impedance pull the secondary voltage down by a few tenths of a percent, so a unit wound to the nominal ratio would test with a negative ratio error at every load it is likely to see. Manufacturers compensate by taking a turn or two off the primary, or adding them to the secondary, so that the error lands near zero at rated burden instead of at the bottom of the band.

The side effect is that the wound ratio is marginally lower than the nameplate ratio. A no-load ratio test on a compensated 0.2 class unit typically reads a fraction of a percent high on the secondary — a ratio a hair under the printed 100:1 — and that is the compensation doing its job. Treating it as a fault is a common way to reject a good batch and delay an energisation by a week.

The allowance is bounded by the class, not by the shop's judgement. A class 0.2 winding may not be pushed beyond ±0.2% ratio error, class 0.5 beyond ±0.5%, class 1.0 beyond ±1.0%, all measured over the 80% to 120% voltage range where the class applies. The limits themselves are published in IEC 61869-3:2011, the inductive voltage transformer standard that replaced IEC 60044-2, with the insulation levels and nameplate rules sitting in IEC 61869-1. Where the compensation lands inside that band is a manufacturing decision; whether it stays inside is what the routine test record proves. The four-test acceptance record explains how the ratio test, polarity check and excitation test fit together, and why a ratio figure on its own does not close out a PT.

To check a delivered unit, energise the primary from a variable low-voltage source at 80%, 100% and 120% of rated winding voltage, read the secondary with a voltmeter or a ratio bridge, and compute K = U1/U2 at each point. Compare against the nameplate ratio and against the class limit, not against the last unit in the store. Any deviation larger than the class limit is a rejection; a deviation of a tenth of a percent in the direction of compensation is evidence the unit was adjusted at all.

Where the ratio gets misread, and what it costs

Red epoxy-cast JDZXW-35 indoor voltage transformer with a tall ribbed bushing, front nameplate plate and rear mounting brackets

Most ratio failures are specification failures that survive all the way to commissioning, because a PT with the wrong ratio still works — it simply reports the wrong voltage for the next twenty years. The four cases below account for most of the ones that reach a site.

What went into the specificationWhat the secondary actually reportsCommercial consequence
10 kV/100 V unit quoted for an 11 kV system90.9% of the true voltage at every pointMeter under-registers by about 9%; on a billing point that is a permanent revenue loss, and a meter test will not find it because the meter is right
100 V winding where the scheme expects 100/√3 V173% of the expected phase voltageProtection sees a permanent over-voltage, the meter multiplier is wrong by √3, and every voltage-based setting on the panel has to be re-derived
Residual winding read as a metering winding57.7% of the expected valueEarth-fault element set 1.73 times too high and does not operate on a real single-phase fault
Compensated unit rejected at a no-load ratio testA fraction of a percent high on the secondaryA compliant batch returned, a re-test paid for twice, and an energisation date lost while the replacement units are cast

The first row is the expensive one because it is invisible. A 10 kV unit on an 11 kV feeder has a valid nameplate, passes its factory routine test against its own rated ratio, and installs without argument. Only the comparison between the nameplate ratio and the system voltage exposes it, which is why the ratio line should be checked against the single-line diagram before the PO is issued rather than at the panel. The line-by-line reading of a PT nameplate covers the remaining traps, including the voltage factor that decides what happens during an earth fault.

What to write into the RFQ or the datasheet

A ratio stated as a single number invites a wrong unit, because three of the parameters that determine the turns are not in it. Phrase the requirement as a set, and a supplier has no room to interpret.

  • System voltage, earthing method, and whether the unit is phase-to-earth or phase-to-phase. This fixes the primary winding voltage, including the √3.
  • A ratio per winding, not per unit. Write 10000/√3 / 100/√3 / 100/3 and say explicitly which winding feeds the meter, which feeds protection, and which is residual.
  • Accuracy class and rated output per core, to IEC 61869-3, with the voltage range over which the class is claimed.
  • Rated voltage factor, 1.2 continuous or 1.9 for 8 hours, chosen from the earthing method rather than copied from the last project.
  • Insulation level as three numbers, for example 12/42/75 kV at 10 kV, and the standard they are quoted to.
  • Documents: routine test record per unit with the measured ratio and error at each voltage point, type test reports for the family, and an outline drawing for approval.

Add one sentence that costs nothing and prevents the commonest error: state the meter and relay models the unit will feed, and the multiplier currently configured in them. A supplier who can see the destination will query a ratio that cannot serve it, and that query is cheaper than a re-cast.

Where Nahu Group Fits

Nahu Group casts indoor and outdoor voltage transformers from 10 kV to 35 kV, including the JDZX9-10 with its 10000/√3 / 100/√3 / 100/3 ratio line, the JDZX9-35 at 35000/√3, and the JDZXW-35 for the 35 kV panels where creepage, not ratio, sets the height. Ratio tables, class and output combinations for the whole range are on the voltage transformer product page.

To get a configuration rather than a catalogue page, send the single-line diagram with the earthing method marked, the system voltage, the secondary convention your meters and relays actually expect, and the class and burden required on each core. Include the quantity and the date the panel has to be energised. That is enough to return a ratio per winding, the compensation allowance we will hold during routine test, and the test documents your inspector will ask for.