A three-phase potential transformer set can be wired four ways, and the diagram you issue decides what the secondaries are able to measure. Y/yn and the three-phase five-limb unit give phase-to-earth voltages plus a residual output; V/V gives three line voltages and no zero sequence at all. That choice is made before the order, not at commissioning.
What the Connection Diagram Has to Fix Before Anyone Draws a Wire
A 3 phase potential transformer connection diagram does three jobs. It states whether the primary star point is earthed or left floating, it lists every secondary winding the set will have, and it gives the voltage each terminal should read once the panel is energised. A drawing that says only "three PTs, 11 kV, 100 V secondary" leaves the supplier free to choose the number of windings, their class and their rating, and those three choices decide whether your earth-fault relay has anything to measure.
The set is bought as a set, so the drawing also fixes what a replacement unit has to match. Ratio is written per winding, not per set: an 11 kV unit with a star secondary is 11/√3 / 0.1/√3, while the residual winding that sits beside it is 0.1/3. Two units of the same family ordered six months apart will only interchange if both fields were on the original drawing.
Four Ways to Connect a Three-Phase PT Set
Only four arrangements appear in MV switchgear practice, and three of them can be described on one sheet. The table below is the version to paste into a scope document, because it separates what each connection measures from what it can protect.
| Connection | Units | Primary | Secondary available | 3U0 output | Where it is used |
|---|---|---|---|---|---|
| Y/yn | 3 single-phase | Star, neutral earthed where the system neutral exists | 57.7 V phase-to-earth, 100 V phase-to-phase | None from the star secondary | Metering and phase-to-earth voltage on an earthed system |
| YN/yn/Δ | 3 single-phase, three windings each | Star, neutral earthed | Star secondary plus broken delta | About 100 V at a solid earth fault | Standard 10–35 kV switchgear with earth-fault protection |
| V/V | 2 single-phase | Phase-to-phase, no neutral | 100 V line voltages only | None, by construction | Metering-only panels, compact retrofits |
| Three-phase five-limb | 1 unit | Star, neutral earthed | Star secondary plus residual winding | About 100 V at a solid earth fault | Compact panels needing 3U0 from one frame |
| Three-phase three-limb, neutral not earthed | 1 unit | Star, floating | Star secondary | Distorted, not proportional | Not usable for earth-fault protection |
The full range of cast-resin indoor units that these arrangements are built from is listed on the voltage transformer product page, grouped by 3–12 kV and 27–40.5 kV families. What matters here is that a three-phase measurement is normally three single-phase units wired together, not one three-phase device.
Y/yn: Three Units With Both Star Points Earthed
Y/yn is the default for an 11 kV or 33 kV panel that needs phase-to-earth voltages for metering or undervoltage logic. Three single-phase units sit one per phase, primaries connected A-N, B-N and C-N, secondaries connected a-n, b-n and c-n. Each unit is the same model and the same ratio, so the set behaves like one three-phase transformer with a star point at each end. A unit such as the JDZ9-10 indoor voltage transformer is the shape this takes at 3–12 kV: one epoxy casting, one primary terminal, a secondary terminal box, and optionally a residual winding in the same casting.
The primary star point is the part that gets argued about. On a system with an earthed neutral, earth the PT star point once, at the star point, and nowhere else. On an isolated or resonant-earthed system, leave it floating: the three windings still present the correct phase-to-earth voltages, because the star point settles at neutral potential through the winding impedances, and earthing it would create an additional earthing point for the network that the system design did not ask for. Either way, the secondary star point is earthed at exactly one place, normally in the terminal box, and never again at the panel. Two earths on the secondary put a parallel path across one phase winding, which shifts every phase-to-earth reading and puts a standing voltage on the residual circuit.
What the Secondaries Should Read at 11 kV, Healthy and Faulted
Take an 11 kV system with 11/√3 / 0.1/√3 units, so the phase-to-earth secondary is 57.7 V and the phase-to-phase secondary is 100 V. The readings below are what a true-RMS meter should show at the terminal box before the relay is connected, and they are also how you tell a blown fuse from a real earth fault. Record all six values at commissioning; a set of readings is evidence, a single voltage is not.
| Condition | Y/yn, phase to earth | Y/yn, phase to phase | Broken-delta output | V/V secondary |
|---|---|---|---|---|
| Healthy, balanced | 57.7 V on each phase | 100 V on each pair | 0–3 V | 100 V on each of the three line voltages |
| Load unbalance only | 57–58 V, slightly unequal | 100 V | 1–5 V | 100 V |
| Solid single-phase earth fault | Near 0 V on the faulted phase, about 100 V on the other two | One pair falls to about 58 V | About 100 V | Unchanged, about 100 V throughout |
| One primary fuse blown | 0 V on that phase, 57.7 V on the other two | Two pairs about 58 V, one pair 100 V | About 33 V standing | One line voltage about 58 V |
| One unit reversed in polarity | Readings look normal | Readings look normal | Standing voltage, fault-like | Derived third voltage 173 V instead of 100 V |
| Broken-delta test link left closed | Normal | Normal | 0 V always, fault or not | Not applicable |
The distinction that saves a callout is between the third and fourth rows. An earth fault pushes two phases up to line voltage, because the neutral shifts and the healthy phases see the full phase-to-phase voltage. A blown fuse pulls one phase down and leaves the other two where they were. Both leave one phase near zero, and only one of them is a fault.
V/V: Two Units, Three Line Voltages, No Zero Sequence
V/V uses two units instead of three. The first primary connects across A-B, the second across B-C, and the two secondaries are connected in series so that the pair of them spans a-c. The result is three line voltages of 100 V each at 120° displacement: a-b and b-c are measured directly, and a-c is either measured at the open terminals or derived as the vector sum of the other two. One unit, one bushing position and roughly a third of the cost disappear, which is why V/V survives in compact ring main units and in retrofits where a third PT will not fit.
What disappears with the third unit is every phase-to-earth quantity. Zero-sequence voltage is the sum of the three phase-to-neutral voltages, and a line voltage is the difference of two of them. Any difference cancels the zero-sequence component exactly, so a quantity built only from line voltages cannot see 3U0 no matter how large it becomes. That is not a sensitivity limit that a better relay can overcome; it is why a V/V set is specified for metering and sync check, never for earth-fault protection. During a solid single-phase earth fault on the system, a V/V secondary keeps showing about 100 V on all three line voltages and reports nothing at all.
V/V has one useful self-check that is worth putting on the commissioning sheet. With correct polarity the open-corner voltage a-c reads 100 V, the same as a-b and b-c. If it reads about 173 V, one of the two units is reversed: the two secondaries are then 60° apart instead of 120°, and their sum is √3 times a single secondary voltage. Correcting that before energisation takes minutes on the terminal block; finding it afterwards usually means a protection misoperation to explain.
YN/yn/Δ: The Third Winding Summed in Broken Delta
The standard 10–35 kV arrangement adds a third winding to each unit and connects the three of them in broken delta, also called open delta. Each residual winding is rated 100/3 V, so the three windings in series produce 100 V when the three phase-to-earth voltages are fully displaced, and approximately zero when the system is healthy because the three voltages sum to nothing. The open corner goes to the relay and nowhere else: it is not earthed, because earthing one corner creates a parallel path that both changes the reading and allows current to circulate through the residual windings.
The ratio of that winding is where sets go wrong. Three 100 V windings in series reach 300 V at the open corner during a solid earth fault, and a relay input rated for 100 V will saturate or be damaged. The 100/3 V rating is what makes the arithmetic come out at 100 V, and it belongs on the datasheet as a separate line from the main secondary. The worked relay settings that follow from that 100 V full-scale output, and the way the standing unbalance limits how sensitive the pickup can be, are set out in the broken-delta output and its relay settings, so this page keeps to the wiring side.
Three-Phase Five-Limb Units: One Frame That Still Produces 3U0
A three-phase five-limb unit puts all three phases in one casting on one core, and the fifth limb is the reason it can still measure zero sequence. Zero-sequence flux needs a return path outside the three phase limbs; the two outer limbs of a five-limb core provide it, so a residual winding fitted to that core sums the three phase voltages in the same way three separate units would. A three-limb core has no such path, and with the neutral unearthed the residual output becomes distorted and no longer proportional to the system voltage, which is why a three-limb unit is not a substitute.
The trade is straightforward. One frame means one mounting, one set of primary connections and a smaller panel, and at 27–40.5 kV it also removes two of the three phase-spacing problems. Against that, a failure takes out all three phases at once, the unit is heavier to handle in a cable basement, and a spare is a complete three-phase set rather than one unit. Where a single-phase family such as the JDZ9-35 indoor voltage transformer is already stocked as a spare, three units keep the panel running on two phases after a single failure, which is worth more than the space saved in most utility specifications.
Which Connection Mistakes Cost Money at Commissioning
Almost every PT problem that reaches a site engineer is a wiring or ordering decision, not a manufacturing defect, and the cost is paid in rework hours and delayed energisation rather than in the price of the units.
- Residual winding ordered at 100 V instead of 100/3 V. The set measures 300 V at the open corner during a fault, the relay input saturates, and the panel fails its primary injection test. The replacement set has a new lead time.
- V/V specified for a panel with an earth-fault element. There is no 3U0 to connect. Retrofitting a third unit means a new set, a new mounting position and a re-tested panel, days after the switchgear was meant to be handed over.
- Secondary earthed at the PT terminal box and again at the panel. A standing voltage appears on the residual circuit, the earth-fault element picks up on a healthy feeder, and the setting has to be raised until it no longer protects the feeder.
- One replacement unit from a different batch or ratio. The set now carries mismatched ratio error or class, the residual standing voltage rises, and the commissioning readings cannot be signed off against the type-test data.
- Polarity never checked before energisation. The mistake shows up as a 173 V open-corner reading on V/V, or as a residual voltage that looks like a permanent earth fault, and it is found during the first protection test rather than on the bench.
The same three wiring variants exist on the current side, and a panel that gets the voltage connections right usually gets the current connections right for the same reason: the drawing states the polarity and the earth point instead of leaving them to habit. The comparison for current transformers, including the star, delta and residual variants, is in star, delta and residual CT wiring with the currents worked out.
What to Write Into the RFQ and the Datasheet
A PT enquiry that lists model numbers only will get a quotation for that model, not for the set your panel needs. The fields below are the ones that change the delivered hardware, and each one can be checked against the drawing when the units arrive.
| Field | What to write | Why it decides the delivered set |
|---|---|---|
| System voltage, frequency, earthing method | 11 kV, 50 Hz, neutral earthed through a resistor, for example | Decides whether the primary star point can be earthed, and therefore whether YN/yn is even available |
| Ratio, written per winding | 11/√3 / 0.1/√3 / 0.1/3 kV, one line per winding | A single "11 kV / 100 V" line cannot describe a three-winding unit |
| Residual winding | 100/3 V per unit, class 3P, stated burden | The 100/3 V rating is what holds the open corner at 100 V instead of 300 V |
| Class and burden per core | 0.2 or 0.5 metering at a stated VA and power factor, 3P protection at its own VA | Two cores with one burden figure is how a metering core ends up oversized for the meter |
| Rated voltage factor | 1.2 continuous with 1.9 for 8 h on an earthed system, or 1.9 continuous where the neutral is isolated | Sets the insulation and thermal duty during a sustained earth fault |
| Terminal markings and drawing | a1-n1, a2-n2, da-dn marked on the casting and repeated on the approved drawing | Lets the panel be wired from the drawing without a polarity argument on site |
| Tests and documents | Routine test report per unit, ratio and polarity results, the family type-test report to IEC 61869-3, outline drawing for approval | What an inspector asks for before energisation, and what a replacement unit must match |
| Quantity and spares | Sets and units stated separately, plus one spare unit where the set is critical | A spare set is not the same order line as a spare unit, and the lead times differ |
One drawing convention finishes the document: mark the single earth point on the secondary, and mark the primary star point as either earthed or floating. The polarity and earthing marks on the drawing are what a panel builder follows when the terminal box is closed and the nameplate is the only thing readable.
Where Nahu Group Fits
Nahu Group manufactures single-phase cast-resin indoor voltage transformers for 3–12 kV and 27–40.5 kV switchgear, with 100 V and 100/√3 V secondaries, class 0.2 and 0.5 metering cores, and an optional open-delta residual winding for earth-fault detection. Sets for three-phase measurement are supplied as three matched units, or as a three-phase unit where the specification calls for one frame.
To get a configuration, send the single-line diagram with the PT symbol and its earth points, the system voltage and earthing method, the ratio required for each winding including the residual winding, the class and burden per core, and the quantity per panel. A unit from the 3–12 kV range, such as the JDZ8-10R indoor voltage transformer with its residual winding, can then be quoted against the drawing rather than against a model number alone.
Frequently Asked Questions
Can a V/V PT set be used for earth-fault protection?
No. Zero-sequence voltage is the sum of the three phase-to-neutral voltages, and V/V measures only differences between phases, where that sum cancels. A V/V set therefore reports about 100 V on all three line voltages during a solid earth fault and gives the relay nothing to act on. Use YN/yn with a broken-delta residual winding, or a five-limb unit with a residual winding, if the panel needs 3U0.
What should a three-phase PT read phase to earth on an 11 kV system?
With 11/√3 / 0.1/√3 units, each phase-to-earth secondary reads about 57.7 V and each phase-to-phase reads 100 V. A 33 kV system with 33/√3 units reads the same secondary values. If the panel uses 110 V secondaries instead of 100 V, the figures scale to 63.5 V and 110 V, and the residual winding rating changes with them.
Does the primary star point of a three-phase PT have to be earthed?
Only where the system neutral is earthed and the drawing says so. On an isolated or resonant-earthed system the PT star point is normally left floating, because earthing it would add an earthing point the network design did not include. The units still measure phase-to-earth voltage in that condition, since the floating star point settles at neutral potential through the winding impedances.
Why does the residual winding read about 33 V on a healthy system?
It should not. A healthy system gives 0–3 V at the open corner, and a standing figure near one third of full scale means one residual winding is contributing nothing, usually because a primary fuse has blown on that phase or because one unit was never connected. Find the cause before adjusting the relay pickup, or the setting will be raised until the scheme no longer trips.
Can three single-phase PTs replace a three-phase five-limb unit?
Yes, for both metering and residual measurement, provided each unit carries the residual winding at the right ratio and the three are matched in class and ratio. Three units also mean a single failure leaves two phases in service and a spare unit is one unit rather than a complete set. The five-limb unit wins on panel space and on primary connection count.
What ratio do I write on the datasheet for a star-connected set?
Write the ratio per winding, not per set. For an 11 kV system with a 100/√3 V star secondary, each unit is 11/√3 / 0.1/√3 kV; the residual winding beside it is 0.1/3 kV; a second metering core is written as its own line with its own class and burden. A single "11 kV / 100 V" entry cannot be built.
Sources and Further Reading
- IEC 61869-3:2011 — Instrument transformers, Part 3: Additional requirements for inductive voltage transformers — the residual winding ratings, voltage factors and accuracy classes the connection diagram has to work with
- IEC 61869-1:2023 — Instrument transformers, Part 1: General requirements — terminal markings, ratings and documentation common to voltage and current transformers
Published Nov 24, 2026 · Nahu Group (NAHU Electric Technology)