A potential transformer is defined by three things: a fixed ratio to a standard 100 V or 100/√3 V secondary, galvanic isolation from the primary system, and a rated burden in VA at which its accuracy class holds. At 12–36 kV the inductive type meets all three at the lowest cost; above roughly 72.5 kV the capacitive type wins.
What the definition actually requires
"Potential transformer" and "voltage transformer" name the same device. IEC 61869-3:2011 calls it an inductive voltage transformer and sets the requirements; North American practice keeps the older term. That matters at the quotation stage, because a supplier who reads "PT" as a generic voltage sensor may offer something that never had to hold an accuracy class under burden. A capacitive divider reproduces the ratio but is not a transformer in the standards sense, which is why the definition starts with the winding.
The three elements are testable, not decorative. Ratio is checked against the nameplate at a stated primary voltage. Isolation is proved by power-frequency withstand and lightning impulse tests on the primary winding. Burden is the total impedance of meters, relays and wiring, expressed in VA at a stated power factor, and it is the element buyers most often leave out of the enquiry — which is why a unit can pass its routine test and still miss its class in service.
| Definition element | Where it appears in a datasheet | What fails if it is missing |
|---|---|---|
| Fixed ratio | Rated primary and secondary voltage, e.g. 11000/√3 : 100/√3 V | Meter multiplier wrong, billing dispute |
| Galvanic isolation | Insulation level, power-frequency and impulse withstand | Panel wiring at primary potential, safety rejection at inspection |
| Stated burden | Rated output in VA, accuracy class held from 25% to 100% burden | Class not held on site, protection maloperation |
| Rated voltage factor | 1.2 Un continuous, or 1.9 Un for 8 h on non-effectively earthed systems | Overheating and insulation ageing after an earth fault |
The three types, and the voltage band each one owns
Three families satisfy the definition, separated by how the primary voltage is divided. The inductive type uses a wound iron-core stack. The capacitive type uses a capacitor divider feeding a small electromagnetic unit. The electronic type uses a low-power sensor with a converter. They are not interchangeable on price alone: each one owns a voltage band, and buying outside that band is where specifications start to cost money. If what you actually need is the comparison against a power transformer, that difference is a separate question.
| Type | How it divides voltage | Typical band | Accuracy and burden | Standard part |
|---|---|---|---|---|
| Inductive (electromagnetic) | Iron core with primary and secondary windings, cast in epoxy | 0.66–36 kV, occasionally to 72.5 kV | 0.1 to 3, and 3P/6P; 10–50 VA typical | IEC 61869-3 |
| Capacitive (CVT) | Capacitor divider plus a small inductive unit | 72.5 kV and above | 0.2 to 3, lower transient fidelity | IEC 61869-5 |
| Electronic (LPIT) | Resistive or capacitive sensor with a digital converter | Any band, practically 72 kV and below | 0.2 to 1 digital output, no VA burden | IEC 61869-6 and 61869-11 |
How the inductive type covers 12 kV to 36 kV
In the 12–36 kV band the inductive type is the default for a reason: a cast-resin body needs no oil, no gas and no maintenance, and it holds 0.2 or 0.5 class at 50 VA. The JDZ10-10 covers 3–12 kV, while the JDZX9-35 covers 27–40.5 kV; both give 100 V and 100/√3 V secondaries with an optional residual winding.
The one field that separates a sound order from a marginal one is the voltage factor. On an effectively earthed system, 1.2 times rated voltage continuous is normal. Where the neutral is not effectively earthed, a healthy phase can sit at line-to-line voltage for hours after a single earth fault, and 1.9 times for 8 hours is the figure to write into the datasheet. A unit rated only for 1.2 will pass its factory test and then age faster than the switchgear around it.
Two cores in one casting: metering, protection and residual
Most buyers need more than one secondary. Metering wants 0.2, 0.5 or 0.2S and stays accurate down to a quarter of rated burden; protection wants 3P or 6P, which tolerates a larger error in normal service so that it does not saturate at fault multiples. Because those two requirements pull in opposite directions, they are built as separate cores in the same casting, and the JDZXW-35 quotes 0.2S/0.5S metering and 5P/10P protection cores on request for 27–40.5 kV switchgear.
A third winding, the residual or open-delta winding, is what lets a relay see zero-sequence voltage on an unearthed system. It is an option, not a standard fit on every frame, and it only works if the three units are wired as a broken delta in the panel. If your protection scheme depends on earth-fault detection, state the residual winding and its ratio in the enquiry — the open-delta wiring and its 100 V earth-fault output are worth reading before you approve the drawing. The ratio and burden checks behind the selection cover the sizing side.
Above 72.5 kV: where the CVT takes over
A capacitive voltage transformer divides the primary voltage across a capacitor stack, then measures the low voltage across the bottom capacitor with a small inductive unit. Above roughly 72.5 kV, the capacitor stack is cheaper and lighter than an insulation system sized to hold full voltage across a winding, and the same divider can carry a line-carrier coupling signal for teleprotection. The trade-off is transient response: after a fault the CVT output takes longer to settle than an inductive unit, which matters for distance protection settings. Specify it under IEC 61869-5.
When an electronic voltage transformer is the only accepted answer
Electronic, or low-power, voltage transformers put a sensor and a converter at the primary and send sampled values to a merging unit instead of driving 100 V copper around the yard. They remove the burden problem entirely and shrink the panel, which is why digital substation projects specify them. The cost moves elsewhere: fibre and merging units into the design, a calibration chain that has to be documented, and type approval to IEC 61869-6 and 61869-11 rather than 61869-3. On a conventional 11 kV panel they add work without removing any.
Classification mistakes and what they cost
Most of the expensive errors are not electrical, they are categorical: the wrong family is quoted, or the right family arrives without the winding the scheme needs. Each one surfaces late, once the panel is built and the protection engineer starts testing.
| Mistake | What it looks like at site | Commercial consequence |
|---|---|---|
| CVT quoted for an 11 kV job | Oversized stack, extra foundation, carrier terminal nobody uses | Cost and space paid for a capability the scheme cannot use |
| Residual winding assumed, not specified | No earth-fault voltage at the relay during commissioning | Replacement units, re-test, delayed energisation |
| Burden left out of the enquiry | Ratio error on a revenue meter that passed factory routine tests | Billing dispute and re-calibration of the whole metering chain |
| Voltage factor mismatched to earthing | Winding damage traced back to a single phase-to-earth fault | Unplanned outage and a repeat order at short notice |
What to write into the RFQ
Write requirements, not descriptions. State the system voltage and whether the neutral is effectively earthed, because that pair decides the voltage factor. State the ratio in the form the meter expects, 11000/√3 : 100/√3 V for a phase-to-earth connection on an 11 kV system. Then give the class and the burden per core, and say how many cores you need.
Add the insulation level, the installation (indoor panel or outdoor), the ambient and pollution conditions if the site is coastal or dusty, and the documents you will ask for at inspection: type test reports to IEC 61869-1 and the construction part, routine test reports, and approval drawings showing the terminal arrangement. Finally, ask for the residual winding explicitly if the protection scheme uses one, with its ratio and class, and confirm the frame is offered with it. A supplier who answers all of that in writing has removed most of the risk before the PO is issued.
Frequently Asked Questions
Is a potential transformer the same as a voltage transformer?
Yes. Both names describe an instrument transformer that reproduces primary voltage at a standard low value for meters and relays. IEC standards use "voltage transformer" and split it by construction: inductive under IEC 61869-3, capacitive under 61869-5. "Potential transformer" is the older term still used in North America and in many project specifications.
Which type should be used at 11 kV or 33 kV?
The inductive type. At those voltages a cast-resin unit gives 0.2 or 0.5 class at 50 VA with no oil, no gas and no maintenance, and it fits the panel depth. A CVT at 33 kV is heavier, more expensive and adds a carrier terminal the scheme does not use. Electronic units only make sense where the substation is digital by design.
What does the 100/√3 V secondary mean?
It is the phase-to-earth secondary of a unit connected phase-to-earth, whose primary is rated at system voltage divided by √3. Three such units give 57.7 V phase-to-neutral and 100 V between phases, and their residual windings add to roughly 100 V during a solid single-phase earth fault. A 100 V secondary belongs to a phase-to-phase rated primary.
Can one transformer serve metering and protection?
It can, but not on one core. Metering class 0.2 or 0.5 must hold its error at rated burden; protection class 3P or 6P deliberately allows a larger error so that it does not saturate at fault multiples. The two are built as separate cores in the same casting, which is why the datasheet lists a class and a burden for each secondary.
What happens if the secondary is short-circuited?
Unlike a current transformer, a voltage transformer must never be short-circuited on the secondary: the winding will overheat and fail. Open circuit is the safe state. That is why the secondary circuit carries fuses or a miniature circuit breaker, and why the test procedure requires proving the secondary is isolated before any primary injection.
Does the mounting position change the definition?
No, but it changes the frame. Indoor panel units are compact cast blocks sized for switchgear compartments; outdoor units carry taller sheds, a higher creepage distance and a weatherproof terminal box. The ratio, class and burden requirements stay identical, so an outdoor enquiry should still quote the same electrical fields.
Published Nov 19, 2026 · Nahu Group (NAHU Electric Technology)