For an 11 kV three-core cable the screen comes off once, in a single square cut, at the dimension on the kit drawing, and it goes back to earth at both ends. Almost every termination that fails at commissioning failed at that cut: insulation scored by a knife, a semi-conductive step left ragged, or a braid landed on painted steel.

NLS-35 indoor cold-shrink three-core termination kit laid out with grey silicone tubes, breakout boot, sealing tapes, cable lugs and gloves

The three screen constructions you will meet

A shielded cable is three different objects depending on who made it. On MV distribution work you meet overlap-wound copper tape, concentric copper wire with a counter-spiral binder, and an extruded semi-conductive layer bonded to the insulation. The first two are the metallic screen and carry earth-fault current; the third only shapes the electric field. They are stripped with different tools and they fail in different ways, which is why "shielded cable termination" is not one specification.

The table below is the classification to put into a comparison sheet before a kit is ordered. If the screen type is not on the cable data sheet, ask for it: the kit, the strip dimensions and the earth lead all follow from that one line.

Screen constructionWhat it looks like at the cable endHow it is cut backTool and consumableWhat goes wrong
Copper tapeOverlapping tape helix under the sheath, lapped over the semi-conductive layerUnwound to the drawing dimension and cut square, then bound with a constant-force spring and the earth braid landed on itShears or a purpose-made tape slitter, spring, braidA tape edge left standing in the field concentrates stress and punctures the insulation at test or in service
Copper wireConcentric wires with a counter-spiral binder tape, sometimes with a copper tape lap underneathCut at the dimension and bent back over the sheath, bound with a spring; wire count recordedSide cutters, spring, braidWires cut short or missing reduce the screen section, so the fault path is thinner than the fault study assumed
Extruded semi-conductive layerBlack layer bonded to the insulation; cannot be unwoundRemoved with a stripping tool in one continuous pass to a clean square step at the drawing dimensionBonded-semicon stripping tool, no knifeA score into the insulation is invisible under the layer and shows up as partial discharge at the cut

One consequence is worth stating early: a copper tape screen is not a wrapping to be torn off. It is the metallic screen covered by IEC 60502-2, it has a specified cross-section, and the earth-fault current of the feeder passes through it until protection clears. Cut it short and the screen no longer has the section the fault study assumed.

How far back does the screen come?

The dimension on the drawing is not a suggestion, and it is not measured from wherever the fitter stopped stripping. On a termination the screen cut-back is dimensioned from the end of the insulation. On a joint it is dimensioned from the centre of the connector. On a separable connector it is fixed by the moulded body. Reading the datum wrong is the most common reason a correctly sized kit ends up ten millimetres out.

AccessoryDatum the drawing usesTypical screen cut-back (confirm on the drawing)Why that length
11 kV three-core terminationEnd of the insulationOrder of 40–60 mmThe stress cone has to sit on clean insulation with its base still over the screen
33 kV three-core terminationEnd of the insulationLonger than the 11 kV figure, order of 60–90 mmHigher class needs a longer creepage path and a larger cone, so the cut moves back
Straight jointCentre of the connectorHalf the joint body each sideThe body length fixes both halves; it is not a free dimension
Separable elbow connectorFace of the bushing or the connector bodySet by the moulded bodyThe screen ends inside the connector, which has its own field control

Two rules follow. Take the dimension from the accessory drawing for the exact kit size, not from a generic table or a photograph of a similar job, because the 11 kV and 33 kV kits differ mainly in this dimension. And cut once: a screen that has been cut twice leaves a second edge standing in the field, and no amount of tape restores the original geometry.

Three checks at the screen cut

The cut is where the cable is electrically weakest, because that is where the field has to be forced out of the insulation into the earthed screen without leaving a void. Three checks decide whether it will hold.

  • One square cut, nothing standing proud. No tape corner, no wire end, no binder thread projecting past the binding spring.
  • A clean semi-conductive step. Square at the drawing dimension, with the insulation diameter measured against the cable data sheet to prove no material was removed with the layer.
  • Stress control seated with no air gap. On a cold-shrink kit that means the moulded cone has fully recovered onto clean insulation, with silicone grease on the insulation only, never between the cone and the screen.

A void at the cut ionises at a fraction of the insulation's withstand voltage, so the defect is neither visible nor audible. It appears at a partial-discharge measurement or a withstand test. That is the point of testing before energisation: the same defect found at works costs a re-termination, while found after energisation it costs a feeder and a supply interruption.

Earthing: which end, and with what section

On a three-core MV cable the screen is earthed at both terminations. The three cores are symmetrical, so the induced sheath voltage and the circulating current stay small, and earthing both ends gives the lowest touch voltage and the shortest earth-fault path. Single-end bonding is a single-core problem, where the induced voltage along a long run has to be calculated and limited; those schemes are set out in the trefoil and sheath bonding guide.

ArrangementWhere it appliesScreen connection at each endWhat commissioning checks
Both ends, directThree-core 11–33 kV, switchgear to switchgear, short feedersBraid to the earth bar at each terminationEarth continuity and a visual check of the braid landing
Both ends through a link boxSingle-core runs where the sheath has to be sectionalised for testingBraid to the link box, link position recordedBonding scheme against the drawing, link position before energisation
Single end with a voltage limiterSingle-core runs where induced sheath voltage is the limiting design caseOne end earthed, the other through the limiterLimiter rating against the calculated standing voltage

The braid is a conductor, not an accessory. Its section is normally taken as not less than the equivalent section of the metallic screen, commonly 16–25 mm² on an 11 kV three-core and 25–35 mm² at 33 kV where the earth-fault level is higher. Land it on bare metal with a star washer at the torque on the drawing: paint, powder coat and anodising are insulators, and an earth continuity test will find them.

Where the screen ends inside a moulded body, and what changes at 0.6/1 kV

A pluggable elbow connector moves the stress control into the factory. The ZT 15 kV/200 A elbow connector is a fully insulated, fully sealed, live-touchable body: the screen is cut to the connector's dimension, the field control is moulded in, and the site work reduces to preparing the cable, inserting the body and landing the earth lead on the screen contact. The error mode changes with it. The fitter can no longer form a bad cone, but can still cut to the wrong datum.

Black elbow-shaped separable cable connector for 15 kV with coiled earth lead, fixing bolts and metal bracket on a white background

At 0.6/1 kV the question usually does not arise. Most LV cable has no metallic screen, so there is nothing to cut back and earth; the work is strip, crimp, restore the sheath, mark the phases. The failures are different as well: a lug crimped with the wrong die, a sheath not sealed against moisture, a phase colour applied to the wrong core.

Finished low-voltage cold-shrink cable termination with grey breakout, colour-coded phase sleeves and copper cable lugs

That is why an MV termination specification should not be copied onto an LV package, or the reverse. The accessory content, the tooling and the inspection points are not the same job, even when both are described as cable terminations.

Mistakes that fail inspection, and what they cost

These come back from site most often, and each one carries a price larger than the kit.

  • Screen cut short so the cone "fits". The stress control no longer overlaps the screen, the joint passes a visual check and fails a partial-discharge test.
  • Bonded semi-conductive layer feathered instead of stepped. The transition becomes a field enhancement point exactly at the cut it was meant to protect.
  • Braid landed on a painted panel. Earth continuity fails at inspection and the feeder cannot be energised until the connection is re-made.
  • Screen opened with a hacksaw blade. The insulation is scored under the screen, invisible until the withstand test.
  • Kit chosen by voltage class alone. The NLS35-3 indoor three-core kit covers 86–124 mm insulation diameter across six sizes, so the tube has to match the cable, not the nameplate.

On an energisation-critical feeder the termination is the cheapest item in the sequence. The re-termination, the second test, the crew and the delayed energisation are the cost, and all of them are decided at the cut.

What to write into the RFQ and the datasheet

An enquiry that carries these fields comes back with a kit size and a drawing instead of a question. State them as requirements, not preferences.

  • Cable. U0/U, conductor size and material, number of cores, insulation diameter, screen type and screen cross-section, sheath and armour.
  • Accessory. Termination or joint, indoor or outdoor, kit size range, and whether the circuit must be unplugged again, which decides separable or not.
  • Environment. Pollution level for outdoor sheds under IEC TS 60815-1, plus the ambient range where it is outside the usual.
  • Earthing. Both ends or single end, braid section, and whether a link box or sheath voltage limiter is part of the scheme.
  • Tests and documents. Routine test reports, installation instruction, drawings for approval, and the site method: VLF or AC resonant rather than DC on extruded insulation.

Add quantity and delivery point. A kit enquiry without the insulation diameter is the most common reason a quotation arrives with a caveat attached, and the caveat usually lands on the delivery date.

Where Nahu Group Fits

Nahu Group makes cold-shrink terminations and joints from 0.6/1 kV to 26/35 kV, including the NLS35-3 indoor and WLS35-3 outdoor three-core kits for 50–800 mm², and the ZT elbow connectors for separable connections. The full termination process is set out in our six-stage MV termination procedure.

Send the cable data sheet with the screen type and section, the insulation diameter and U0/U, plus the accessory type, the earthing arrangement and the quantity. That is enough to fix a kit size, a drawing number and the earth lead, and to say plainly which sizes we make and which we do not.

Frequently Asked Questions

Do I earth the screen at both ends on an 11 kV three-core cable?

Yes. On a three-core cable the cores are symmetrical, so induced sheath voltage and circulating current stay small, and earthing both terminations gives the lowest touch voltage and the shortest earth-fault return path. Single-end bonding with a voltage limiter belongs to single-core runs, where the induced voltage has to be calculated for the route length first.

How much screen should be cut back?

Exactly the dimension on the accessory drawing for that kit size, measured from the datum the drawing states, which is normally the end of the insulation on a termination. Typical values run from about 40 mm on an 11 kV three-core up to roughly 90 mm at 33 kV, but the drawing governs: the same cable takes a different cut-back with a different kit.

What happens if the semi-conductive step is ragged?

A feathered or stepped edge concentrates the field at the transition instead of grading it. The termination may pass a visual inspection and then fail a partial-discharge measurement or a withstand test, and if it passes both it degrades in service. The step has to be square at the drawing dimension, cut with a stripping tool rather than a knife.

Can a knife be used to remove bonded semi-conductive layer?

No. A knife follows the operator's hand, not the cable axis, and a score of a fraction of a millimetre into the insulation is enough to start a discharge path under the stress cone. Use a bonded-semicon stripping tool set to the insulation diameter, take the layer off in one pass, and check the insulation diameter afterwards against the cable data sheet.

Is a copper tape screen as good as a wire screen?

Both are metallic screens and both are specified by cross-section, so the question is which one the cable has, not which is better. Tape has to be bound with a spring and the braid landed on it; wire has to be cut to the dimension with every wire retained and bent back. Losing tape turns or wire strands reduces the fault-current path in either case.

What test should be done after terminating a shielded cable?

A withstand test on extruded insulation, using very low frequency or AC resonant methods rather than DC, together with an earth continuity check on the screen braid. DC testing can leave charge trapped in the insulation and does not stress the cut the way service voltage does, which is why the site method belongs in the specification.

Published Nov 26, 2026 · Nahu Group (NAHU Electric Technology)