Above roughly 110 kV, the capacitor voltage transformer (CVT) is the default: utilities specify it because the capacitive divider doubles as the coupling capacitor for power-line carrier, and because a magnetic unit at that voltage would be enormous. At 35 kV and below the epoxy-cast electromagnetic PT wins outright — more secondary output, better accuracy at full burden, and a fraction of the price. The voltage class decides this, not the catalogue.
Three bands cover almost every enquiry. Up to 40.5 kV, an indoor cast-resin transformer such as the JDZ10-10 is the normal answer for switchgear metering, protection and residual-voltage duty. Between 72.5 kV and 145 kV both technologies are technically available, and the CVT usually wins on new utility specifications because carrier coupling is already required for the line. From 145 kV upward the CVT is effectively the only practical option, and the question stops being a comparison.
| System voltage | Device normally specified | Reason it wins |
|---|---|---|
| 3–40.5 kV, indoor switchgear | Cast-resin electromagnetic PT | Enough output in one moulding, no oil, lowest cost |
| 72.5–145 kV | CVT, with inductive VT still quoted | Carrier coupling built in; insulation shared with the divider |
| 145 kV and above | CVT | A magnetic primary at that voltage is impractical to build and ship |
What follows is the procurement view. It sets the two devices against each other on the six ratings that appear on a comparison sheet, then explains why the split falls where it does, and closes with the lines to write into the RFQ so that the quotation you get back can actually be checked.
What a capacitor voltage transformer actually contains
A CVT is not a transformer with a capacitor bolted onto it. The measuring chain starts with a capacitive divider: a stack of series capacitors, C1, sitting in the live column, and C2 to earth. That divider drops the line voltage to a few kilovolts, and an intermediate electromagnetic transformer then takes the reduced voltage down to the standard secondary values of 100 V or 100/√3 V. Everything the buyer sees at the terminal block is produced by that intermediate unit, but everything that decides the ratio is in the divider.
Three accessories decide whether the assembly behaves as a measuring device. A tuning, or damping, reactor compensates the phase shift the divider introduces and limits ferroresonance between the divider capacitance and the intermediate transformer. A carrier-frequency terminal and drain coil let power-line carrier signals travel between the line and the coupling equipment without entering the measuring winding. A protective gap or surge arrester across the intermediate circuit limits what reaches the windings when a surge arrives down the stack. The build of the electromagnetic alternative, without any of this, is set out in how a potential transformer is put together.
IEC 61869-5 is the part of the instrument transformer standard that covers the capacitor type, and it is the document to quote in a specification. It matters because the accuracy of a CVT is a property of the whole chain, not of the transformer alone: a divider whose capacitance drifts with temperature, or a reactor that is wrongly tuned, moves the ratio at the terminal block even though the intermediate transformer is perfect.
Six differences that decide the purchase
This is the table to copy into a comparison sheet. It is written from the buyer's side: what each device does to the secondary circuit, and what has to be checked before the order is placed.
| Criterion | Capacitor voltage transformer (CVT) | Electromagnetic PT (cast resin) |
|---|---|---|
| Accuracy class | 0.1 to 3 for metering, 3P or 6P for protection, demonstrated at 25 % and 100 % of rated burden | 0.2, 0.5, 1 and 3 for metering, 3P or 6P for protection, same burden rule |
| Transient response | Subsidence transient from energy stored in the divider and reactor; protection settings must be checked against it | No divider transient; the risk to manage is ferroresonance with breaker grading capacitance |
| Secondary burden | Limited per winding, typically tens to low hundreds of volt-amperes at metering class | High for the size: 200 to 1,000 VA maximum depending on model |
| Carrier interface | Carrier-frequency terminal included, ready for power-line carrier | None; a separate coupling capacitor and line trap are needed |
| Cost | Higher: divider stack, reactor, carrier accessories, more testing | Lower: one casting, two windings, routine tests only |
| Size and footprint | Tall column, usually outdoor, with a base tank for the intermediate unit | Compact block that mounts inside a switchgear compartment or on a small base |
Read the burden row before the accuracy row. A CVT quoted at class 0.5 is accurate at class 0.5 over a stated burden window; add a relay, a meter, a transducer and 60 m of 2.5 mm² cable to the circuit and the actual burden can leave that window, at which point the class on the nameplate no longer describes what the meter sees. An electromagnetic PT has far more headroom on the same duty: the JDZ10-10B holds class 0.5 to 50 VA and class 1 to 100 VA in a single casting, which is why distribution metering panels are almost never built around a CVT.
The transient row is the one that gets skipped. A CVT stores energy in the divider capacitance and the tuning reactor, and after a primary fault is cleared that energy discharges into the secondary circuit as a decaying transient. For metering it does not matter. For a distance relay or a fast protection scheme it can matter, and IEC 61869-5 provides for transient performance classes precisely because the relay supplier will ask which one applies.
Why 110 kV and above is CVT territory
The first reason is insulation volume. A magnetic voltage transformer for 145 kV needs a primary winding insulated to the full lightning impulse level of the system, a core sized for the flux at that voltage, and an oil or gas volume to hold both. The result is a tall, heavy unit whose only job is to step voltage down. A CVT needs a tall column as well, but in a CVT the column is the measuring element: the same capacitor stack that holds off the voltage also divides it, so the insulation and the divider are one piece of hardware rather than two.
The second reason is carrier coupling. A substation that uses power-line carrier for teleprotection or telemetry needs a capacitor connected to the line, with a terminal for the coupling equipment. A CVT has that terminal as part of its construction. Choosing an inductive transformer at 110 kV means buying a separate coupling capacitor and its accessories, installing both, and finding room for both in a yard where space is already the constraint.
The price of that arrangement is paid in the protection scheme and in the secondary design. The CVT gives the utility one device doing two jobs, but it gives the protection engineer a transient to check and a smaller burden window to respect. Both are routine at 110 kV and above, where the secondary circuits are engineered by specialists; neither is routine on a 10 kV distribution board, which is why the technology does not migrate downward.
Why 35 kV and below still uses cast-resin electromagnetic PTs
At distribution level the economics invert, and they invert on every axis at once. A cast-resin PT is one moulding: core, primary winding, secondary windings, epoxy body, terminal studs and a base plate. There is no divider to tune, no reactor to damp, no carrier accessory and no oil to test or replace. The unit mounts inside a switchgear compartment, needs no maintenance beyond a visual check, and the output available from that single casting is large relative to what a metering or protection circuit draws.
The numbers from the range make the point. Three indoor models cover the 3–12 kV band, and each carries the full burden set at the four standard classes:
| Model | Voltage class | Rated ratio | Class 0.2 | Class 0.5 | Class 1 | Class 3 | Max output |
|---|---|---|---|---|---|---|---|
| JDZ10-10 | 10 kV | 10000/100 V | 15 VA | 30 VA | 60 VA | 150 VA | 200 VA |
| JDZ10-10B | 10 kV | 10000/100 V | 30 VA | 50 VA | 100 VA | 200 VA | 300 VA |
| JDZ16-10R | 10 kV | 10000/100/100 V | — | 50/50 VA | — | — | 500/500 VA |
| JDZ16-10R | 10 kV | 10000/100 V | 30 VA | 90 VA | 250 VA | 400 VA | 1,000 VA |
The same unit also exists with an insulation level of 12/42/75 kV for a 10 kV system, which is the figure to check against the switchgear it sits in rather than against the nominal voltage. At 35 kV the equivalent is the JDZ9-35 for 27–40.5 kV switchgear, cast in the same way with class 0.2 and 0.5 windings and an optional open-delta residual winding. Nothing in that construction needs a reactor, a carrier terminal or a transient study, and the delivered cost reflects it.
Where the choice is genuinely close
Two situations produce real debate rather than a rule. The first is a 66 kV or 110 kV substation that uses no power-line carrier at all, typically a compact industrial or renewable connection: there the CVT's main advantage disappears, and an inductive transformer is technically defensible if the secondary burden is modest. The band in which both types are quoted is set out in the voltage range each transformer type owns, and it is worth reading before a type list is frozen. The second is a retrofit, where the existing yard, the protection scheme and the type list of the utility all point one way and the tender points the other; in that case the deciding document is the utility's approved type list, not a comparison table.
Below 40.5 kV the closest question is not CVT against PT but which winding set to order. On an unearthed or resistance-earthed system, earth-fault detection needs an open-delta residual winding: the three phase-to-earth secondaries wired in broken delta, giving a voltage that rises when one phase goes to earth. A transformer such as the JDZX9-10 with a residual-voltage winding carries that third winding inside the same casting, at a small cost premium over the two-winding version.
Selection mistakes and what they cost
Sizing on ratio alone. The most common error is to order by voltage ratio and treat accuracy class and burden as paperwork. A 10 kV feeder whose metering circuit draws 45 VA at class 0.5 cannot use a unit rated 30 VA at that class; the transformer will operate outside its accuracy window and the meter will read a ratio error that no calibration at the panel can remove. The cost appears months later as a revenue dispute or a failed accuracy test on site.
Expecting CVT burden from a CVT. At 110 kV, a specification that copies a distribution-panel burden onto a CVT ends in either a much larger and more expensive unit or a deviation at bid evaluation. If the secondary design needs 200 VA at class 0.5, that requirement has to be resolved at the design stage, because no amount of supplier selection will produce it from a conventional CVT.
Omitting the residual winding. On an unearthed 10 kV or 35 kV system, a phase-to-phase ratio transformer set without a residual winding leaves the earth-fault relay with nothing to measure, and the gap is usually discovered during commissioning, not at the drawing stage. The rework is a new transformer set, a new drawing approval and a delay to energisation.
Ignoring ferroresonance. An inductive PT connected to an unearthed system can resonate with the grading capacitance of the circuit breaker that feeds it, driving the core into saturation and destroying the primary winding. The standard mitigation is a damping resistor across the residual winding, and it is worth specifying at the order stage instead of adding it after a failure.
What to write into the RFQ and datasheet
A quotation can only be checked against lines that were written down. These are the lines that decide which device a supplier will offer, and they belong in the enquiry whether the answer is a CVT or a cast-resin PT:
| Requirement | What to state |
|---|---|
| System | Highest voltage for equipment, rated frequency, earthing arrangement, indoor or outdoor installation |
| Insulation | Rated insulation level as listed in IEC 61869-1, matching the switchgear it serves |
| Ratios | Every ratio required, phase-to-phase or phase-to-earth, with the winding count |
| Accuracy and burden | Class and rated output for each winding separately, plus the measured burden of the connected circuit |
| Residual winding | Whether an open-delta residual winding is needed, and its class |
| Transient performance | For a CVT: the transient class the protection scheme requires |
| Carrier | For a CVT: whether a carrier-frequency terminal is required, and the coupling scheme |
| Documents | Routine test report, type test reports, outline drawing for approval, nameplate schedule |
Two lines are worth more than the rest. The measured burden, not the rated burden, is what decides whether the accuracy class survives on site, and the insulation level, not the nominal voltage, is what decides whether the unit can be installed in the switchgear you have already bought. The way ratios and secondary windings are written into a datasheet is covered in selecting ratios and secondaries for a VT. Suppliers quote what the enquiry asks for; a specification that leaves either line out will be filled in by assumption.
Frequently asked questions
Can a CVT be used at 11 kV?
Technically yes, practically almost never. The divider, reactor and carrier accessories add cost and volume that a distribution switchgear compartment cannot absorb, and a cast-resin transformer at 11 kV delivers more secondary burden for a fraction of the price. CVTs appear below 72.5 kV mainly where a carrier coupling requirement already exists and the yard has room for the column.
Is a CVT more accurate than a potential transformer?
Not inherently. Both types are offered at class 0.2 and 0.5, and both have to demonstrate that accuracy at 25 % and 100 % of rated burden under IEC 61869-1. What differs is headroom: an electromagnetic unit holds its class over a wider burden range, while a CVT's accuracy is tied to a narrower window and to the temperature stability of the divider.
Why do utilities use CVTs at 110 kV instead of magnetic PTs?
Insulation volume and carrier coupling. A magnetic primary at 110 kV is a large oil-filled unit doing one job, whereas the CVT column both insulates and divides the voltage, and it supplies the capacitor the utility needs for power-line carrier anyway. One device performing two duties takes less yard space than two separate ones.
What secondary voltage does a CVT produce?
The same standard values as an inductive transformer: 100 V for phase-to-phase ratios and 100/√3 V for phase-to-earth ratios, with 110 V and 100/√3 V variants on some systems. The intermediate transformer sets the secondary value, and the divider is proportioned to present the correct voltage to that transformer at rated primary voltage.
How do I know whether I need a residual-voltage winding?
It depends on the earthing arrangement. On a solidly earthed system the phase-to-earth voltage stays close to normal during an earth fault, so protection can work from phase quantities. On an unearthed or resistance-earthed system the residual winding is what gives the relay a measurable zero-sequence voltage, which makes it a requirement rather than an option.
Does IEC 61869-5 cover the whole CVT?
It gives the additional requirements for capacitor voltage transformers and is read together with IEC 61869-1, the general part. The inductive type is covered by IEC 61869-3. A CVT specification should cite 61869-1 and 61869-5; a specification for an epoxy-cast PT should cite 61869-1 and 61869-3, plus whatever utility clause applies.
Sources and further reading
- IEC 61869-5:2011 — Instrument transformers, Part 5: Additional requirements for capacitor voltage transformers. The standard behind the CVT rows in the tables above.
- IEC 61869-3:2011 — Part 3: Additional requirements for inductive voltage transformers. The document an epoxy-cast PT is type tested against.
- IEC 61869-1:2023 — Part 1: General requirements, including the insulation levels quoted for each voltage class.
- Voltage transformers for 3 kV to 40.5 kV switchgear — the cast-resin range the output figures in this article come from.
Published Nov 21, 2026 · Nahu Group (NAHU Electric Technology)