A single 11 kV feeder panel normally carries four CT duties, not one: tariff metering, overcurrent protection, local indication and SCADA measurement, and earth-fault detection. They are separate cores because the four duties disagree about what matters — metering wants tight limits at 5% of rated current, protection wants a defined limit factor at 20 times rated, and the earth-fault core wants sensitivity to a few amps. One core cannot hold all three priorities.

Red epoxy-cast LZZBJ9-10 indoor current transformer with P1 and P2 marked on the top face and a clear secondary terminal cover

What one feeder panel asks four cores to do

The four duties differ in three parameters: the current range over which accuracy matters, the burden they present, and what happens if they get the wrong signal. Metering is judged over the whole load profile and feeds a revenue number. Overcurrent protection is judged near the fault level and feeds a trip decision. Indication is judged at normal load and feeds an operator's understanding. Earth-fault detection is judged at a few amps and feeds a decision that phase overcurrent cannot make at all.

DutyWhere accuracy mattersTypical classTypical outputFailure if misapplied
Tariff metering1% to 120% of rated current, all day0.5S or 0.2S10–15 VARevenue error that compounds silently
Overcurrent protection2 to 20 times rated current5P20 or 10P2015 VARefusal to trip, or a trip that is late
Indication and SCADA20% to 120% of rated current1.0 or 0.55–10 VAWrong reading accepted as normal
Earth-fault detectionFault current of a few amps5P10 or a dedicated core-balance core5–10 VAEarth fault never detected

Read the table as a statement about bodies, not about cores in isolation. A two-core body carries metering plus one protection core; a three-core body adds indication or a second protection set; four duties in one panel usually means a three-core body plus a separate core-balance CT for the earth fault, because the residual duty needs a different window rather than another core in the same casting.

Metering: the core that has to be right at 2 a.m.

The metering core is sized on the load profile, not on the transformer rating. A feeder that runs at 70% of its design current during the day and 12% overnight is the normal case on a distribution network, and a class 0.5 core without the S suffix has no guaranteed limits below 5% of rated current. That is the argument for 0.5S: the limits start at 1% and hold to 120%, so the overnight energy is measured inside a specification rather than outside one.

Burden for this core is small and predictable — a digital meter at around 0.5 VA, a transducer at about 1 VA, and the secondary leads. On a 30 m run of 2.5 mm² the loop resistance is roughly 0.21 Ω, which is 5.3 VA at 5 A, so the total lands near 7 VA and a 10 VA output covers it with margin for a second device. What the metering core must not carry is the protection relay: a trip coil operation or a relay test on that circuit disturbs the revenue register, and the two duties are separated for exactly that reason.

Protection: class and limit factor, read together

A 5P20 core is defined by two numbers that only mean something as a pair. The 5P is the composite error at the accuracy limit, and the 20 is the multiple of rated primary current at which that limit applies. On a 400/5 core, 5P20 holds to 8,000 A. Above that the core saturates and the relay sees a reduced, distorted current, which is a behaviour, not a fault: the core is undamaged and the current is simply not reproduced.

Whether that matters depends on the protection scheme. A definite-time overcurrent relay only needs to know that the current is above its setting, so saturation at 30 kA changes nothing. An instantaneous high-set element set near the fault level, a distance scheme, or a transformer differential needs the current reproduced through the fault, and there the answer is a higher accuracy limit factor at the same ratio, a class PX core with a stated knee point and magnetising current, or a transient performance core. Specifying 5P20 for every duty is the habit that produces the first three and fails the fourth.

Wall-mounted bushing-type LAZBJ-10 indoor current transformer on a galvanised square mounting plate with a flat primary bar terminal

Indication and SCADA: accuracy is not the point

The panel ammeter and the RTU input exist so that an operator or a control room knows roughly what the feeder is carrying. Class 1 is adequate: a 1% error at full load changes no decision, and the display is read to the nearest amp in any case. What matters more is that this core is not the metering core — a transducer drawing 1 VA on a 0.2S circuit would spend accuracy that the tariff depends on, for a reading nobody bills against.

The practical argument for a separate indication core is testing. With three cores in a body, a secondary injection test on the protection core leaves metering and indication undisturbed, and a meter replacement does not require the protection circuit to be shorted and reopened. On a panel that is inspected and re-tested periodically, that separation is worth more than the third core costs.

Front elevation of a red epoxy-cast 10 kV current transformer with P1 and P2 embossed on the face and four primary studs on top
DutyDevices in the loopTypical burden at 5 AOutput to specify
Tariff meteringDigital meter 0.5 VA, transducer 1 VA, 30 m of 2.5 mm² leads 5.3 VAAbout 7 VA10 VA at 0.5S
Overcurrent protectionNumerical relay 1 VA, same leads 5.3 VA, allowance for a test blockAbout 7 VA15 VA at 5P20
Indication and SCADAPanel ammeter 1–2 VA or RTU input 1 VA, short panel leads2–4 VA5 VA at 1.0
Earth-fault detectionEarth-fault relay 1 VA on its own core or core-balance CT1–2 VA5 VA at 5P10

The column worth copying into a specification is the third one, because it is the only column that cannot be read off the CT datasheet. Burden is a property of the panel, and it is fixed by the meter, the relay, the test block and the cable route — none of which the CT supplier can see from a ratio and a class.

Earth-fault detection: the duty phase cores cannot do

Three phase cores connected in residual give a zero-sequence current by summation, and on a healthy feeder that sum is not zero. Ratio errors, phase displacement and unequal lead burden leave a spill current that is a few percent of load current, and the earth-fault setting has to sit above it. On a feeder carrying 300 A, a 3% spill is 9 A — which sets the sensitivity floor of the whole scheme.

A dedicated core-balance CT around all three cores, or a residual core with a lower ratio and its own class, moves that floor down by an order of magnitude because the spill no longer scales with load current. Where the earth-fault setting has to be below 10 A on a loaded feeder, the residual connection from phase cores is the wrong instrument, whatever its class. The core allocation table above assumes the earth-fault duty is served by a dedicated core or a core-balance CT, not by arithmetic on three phase cores.

Where core allocation goes wrong

Three mistakes dominate. The first is buying a two-core body — one 0.5 metering core and one 5P20 protection core — and then wiring the ammeter and the RTU to the metering core. The revenue circuit then carries the transducer burden and the panel reading disappears whenever the meter is changed. The second is using the protection core for metering on a feeder where protection was ordered first: a 5P20 core has a composite error limit of 5%, which is ten times the metering error, and the tariff is calculated on it anyway.

The third is the earth-fault setting. A scheme designed around residual summation from three 400/5 cores, installed on a feeder that later grows to 600 A, has a spill current that grows with the load and an earth-fault setting that has to be raised to match. The protection then fails to see the resistive earth faults it was installed for, and the fault is found by a customer call rather than by the relay. Each of these is a wiring or ordering decision taken at the panel, months after the CT was specified, and none of them shows up in a routine test.

What to write into the RFQ and the datasheet

State the cores one by one, with the duty named. A CT enquiry that lists four duties and four sets of parameters comes back with a body that can hold them; one that lists a ratio and a class comes back with a two-core body and a discussion.

  • System voltage, indoor or outdoor position, and the panel type the core has to fit.
  • Design current and its basis, then the ratio per core — the same ratio on all cores unless a duty justifies otherwise.
  • Per core: duty, class, rated output, and for protection cores the accuracy limit factor.
  • Number of cores in one body, and whether combined class cores are acceptable.
  • Connected burden by device for each core, with secondary lead length and cross-section.
  • Prospective fault level, so the protection core's limit factor can be checked rather than assumed.
  • Earth-fault arrangement: residual from phase cores, dedicated residual core, or core-balance CT, and the required pickup.
  • Documents: routine test report, type test report to IEC 61869-2, outline drawing and terminal marking for approval.

Where Nahu Group Fits

Nahu Group makes epoxy-cast current transformers for indoor and outdoor medium voltage switchgear, in single, double and combined class bodies, with metering cores in 0.2S and 0.5S and protection cores in 5P and 10P. The range is on the current transformers product page; the body in the first photograph is the LZZBJ9-10 indoor current transformer, the third is the LZZBJ9-10S, and the second photograph showing a wall-mounted bushing-type body from the same range, the LAZBJ-10.

To get a configuration, send the four duties with the class, output and limit factor each one needs, the ratio, the connected burden and lead length per core, the fault level, and the panel drawing. That is enough to propose a core allocation and return an outline drawing for approval rather than a ratio on its own. The class limits behind each duty are compared in the accuracy class comparison, and how the ratio itself is fixed is set out in the sizing chart walk-through.

Published Nov 25, 2026 · Nahu Group (NAHU Electric Technology)