A CT sizing chart fixes three numbers in a fixed order: the ratio from 1.2 times the design current, the rated output from the burden you actually connect, and the class from what the core feeds. A 1,250 kVA transformer on an 11 kV bus draws 65.6 A, so the ratio is 100/5 — not because 75/5 is unavailable, but because 65.6 times 1.2 is 78.7 A and the next standard rating above it is 100 A.
The three numbers, and the order they are fixed in
Ratio, output and class are not independent choices. The ratio sets the current the core sees at a given primary current, the output sets how much burden it can carry before the error limits are exceeded, and the class sets the error limits themselves. Change one and the other two move. A chart that lists them side by side is useful only if it is read in order, because a ratio chosen to suit a protection core will usually cost metering accuracy at light load.
The order that survives review is: design current first, ratio second, connected burden third, output fourth, class fifth, accuracy limit factor last. Each step depends on the one before it, and none of them can be settled from the transformer rating alone — which is where most sizing sheets stop.
Step 1: the ratio comes from 1.2 times the design current
Take the current the circuit will actually carry, not the rating of the transformer behind it, and multiply by 1.2. The factor covers normal overload, a modest ambient derating of the cable, and the difference between a design current calculated at the busbar and the current the core sees at the cable termination. It is engineering practice rather than a clause in a standard, so state it in the datasheet if the project wants it applied.
Then round up to the next standard primary rating. The step matters more than it looks: a ratio chosen too close to the design current puts the core into saturation on every motor start and every cold-load pickup, and a ratio chosen far above it pushes the normal load down to a few percent of rated current, where the accuracy class no longer promises anything. On a 11 kV incomer the two failure modes are a 75/5 core that saturates at 1.5 times load and a 400/5 core that reads 16% of rated current at full load.
The chart: 50 to 2000 A, and what the secondary turns mean
The table below is the working range for medium voltage switchgear cores, with the secondary turns implied by each ratio. With a single-turn primary — a busbar or cable through the window — the turns ratio equals the current ratio, so a 100/5 core has 20 secondary turns and a 100/1 core has 100. That is why the 1 A secondary is physically larger for the same ratio: five times the turns in the same window.
| Primary / secondary | Ratio | Secondary turns, single-turn primary | Typical use |
|---|---|---|---|
| 50/5 | 10 | 10 | Small feeder or capacitor branch |
| 100/5 | 20 | 20 | 1,250 kVA transformer incomer at 11 kV |
| 200/5 | 40 | 40 | 2,500 kVA incomer, or a feeder with growth |
| 400/5 | 80 | 80 | Bus section, 5 MVA class incomer |
| 600/5 | 120 | 120 | Distribution feeder with high design current |
| 1,000/5 | 200 | 200 | Main incoming or transformer secondary side |
| 2,000/5 | 400 | 400 | Generator or large busbar rated section |
| 100/1 | 100 | 100 | Long secondary run to a remote relay panel |
| 600/1 | 600 | 600 | Long run, where 5 A lead burden would overrun the core |
Read against the transformer it protects, the chart collapses into a short list. At 11 kV the design current is the transformer rating divided by 19.05, so a 500 kVA unit draws 26.2 A and takes a 50/5 core, an 800 kVA unit draws 42 A and takes a 75/5, a 1,250 kVA unit draws 65.6 A and takes a 100/5, and a 2,500 kVA unit draws 131 A and takes a 200/5. At 33 kV the same ratings draw a third of the current and the cores step down with them, which is why a 2,500 kVA transformer on a 33 kV bus is a 75/5 job rather than a 200/5 one.
| Transformer rating | Design current at 11 kV | Ratio at 11 kV | Design current at 33 kV | Ratio at 33 kV |
|---|---|---|---|---|
| 500 kVA | 26.2 A | 50/5 | 8.7 A | 15/5 |
| 800 kVA | 42.0 A | 75/5 | 14.0 A | 20/5 |
| 1,250 kVA | 65.6 A | 100/5 | 21.9 A | 30/5 |
| 2,500 kVA | 131 A | 200/5 | 43.7 A | 75/5 |
Where two transformers run in parallel on one bus section, the bus-section core sees the sum, and the ratio follows the sum rather than either unit. Reading the chart from a single transformer rating and then installing the core on a bus section is the second most common sizing error after omitting the 1.2 factor.
The 1 A secondary earns its place on lead burden alone. Two hundred metres of 2.5 mm² copper in a closed loop measures about 1.4 Ω, which is 35 VA at 5 A and 1.4 VA at 1 A. On a panel-mounted core with a short run, 5 A is the cheaper and more common choice; on a run to a separate relay room, the 5 A core needs a rated output the switchgear bay may not have room for.
Step 2: the rated output comes from what you actually connect
The 1 A secondary is not free. For the same ratio it needs five times the secondary turns in the same window, which makes the core taller and the body heavier, and on a retrofit into an existing compartment that can decide the purchase on its own. Take the 1 A option where the run is long enough for lead burden to exceed the output available at 5 A, and stay with 5 A where the core sits in the same panel as the devices it feeds.
Rated output is the burden, in volt-amperes, that the core can carry at its stated class without exceeding the error limits. It is not a maximum and it is not a safety rating: a 15 VA core driving 30 VA does not fail, it simply stops being a 0.5 class core. Add up every device in the loop, then add the leads at the secondary current you have chosen, then pick the next standard output above the total.
| Rated output | What typically fits inside it at 5 A | Where it is normally specified |
|---|---|---|
| 5 VA | One digital meter or one analogue ammeter, short panel leads | Metering-only core inside a compact panel |
| 10 VA | Meter plus one transducer, or a single relay with short leads | Combined metering and indication |
| 15 VA | Meter, transducer and a relay, or 20–30 m of 2.5 mm² leads | The common default for 11–33 kV feeder cores |
| 20 VA | Two relays, or one relay with a 100 m run | Protection cores in a relay room layout |
| 30 VA | Electromechanical relays, or a long 5 A run | Retrofit work and older panels |
The arithmetic that catches people out is that lead burden rises with the square of the secondary current while output is quoted in volt-amperes at rated current. Doubling the run quadruples the lead burden; changing from 5 A to 1 A drops it by a factor of twenty-five. The full budget, including the resistance table for each cross-section, is worked through in the CT burden and lead size calculation.
Step 3: class and ALF, and why ALF is not the fault level
Metering cores are specified by accuracy class and an S suffix where light load matters: 0.2S or 0.5S keeps the error limits valid from 1% of rated current, which is what a transformer that runs at a few percent overnight needs. Protection cores are specified by class and accuracy limit factor together — 5P20 means a 5% composite error at 20 times rated primary current. What that number does not mean is that the core reproduces the fault current accurately; beyond the ALF it saturates, and the relay sees a fraction of the primary current.
Metering accuracy at light load is arithmetic, not opinion. On the 100/5 core, the 65.6 A design current is 66% of rated, comfortably inside any class. An overnight load of 15% of design current is 9.8 A, or 9.8% of rated, still inside the 5% floor of a plain 0.5 class core. Drop to 5% of design current — 3.3 A, or 3.3% of rated — and the plain core has no guaranteed limits at all, while a 0.5S core is still specified down to 1%. Whether that matters is a revenue question: a transformer that carries a third of its energy overnight is exactly the case where the S suffix pays for itself.
On the 100/5 core above, 5P20 holds to 2,000 A. A 25 kA bus fault is 250 times rated, so the core is deep into saturation for the duration of the fault, and the secondary current the relay receives is a distorted, reduced version of the primary. For a definite-time overcurrent relay that is acceptable, because the relay only needs to know that the current is above its setting. For a high-set instantaneous element set near the fault level, or for a differential scheme, it is not: those need a core with a higher ALF at that ratio, a class PX core with a defined knee point, or a transient performance core. The class limits themselves, and how the S suffix alters them, are set out in the accuracy class comparison.
Worked example: a 1,250 kVA, 11 kV transformer incomer
A 1,250 kVA transformer on an 11 kV bus, with a 25 kA prospective fault level at the incomer, a digital meter and a numerical overcurrent relay in the same panel, and 30 m of 2.5 mm² secondary cable. Read through the steps in order:
- Design current: 1,250,000 / (1.732 × 11,000) = 65.6 A.
- Ratio: 65.6 × 1.2 = 78.7 A, so the next standard rating is 100 A — a 100/5 core.
- Connected burden, metering: meter 0.5 VA plus transducer 1 VA plus 30 m of 2.5 mm² (0.21 Ω loop, 5.3 VA at 5 A) = about 7 VA, so a 10 VA output at 0.5S.
- Connected burden, protection: relay 1 VA plus the same leads 5.3 VA = about 7 VA, so a 15 VA output at 5P20 gives margin for a second device or a longer run.
- Fault check: 25 kA / 100 A = 250 times rated, against an ALF of 20. The protection core saturates well below the fault level, which is acceptable for definite-time overcurrent and not acceptable for a high-set element set above 2 kA.
| Parameter | Metering core | Protection core |
|---|---|---|
| Ratio | 100/5 A | 100/5 A |
| Rated output | 10 VA | 15 VA |
| Class | 0.5S | 5P20 |
| Accuracy holds from | 1% to 120% of rated current | Up to 20 times rated primary |
| Governing check | Light-load error on the overnight load | Whether the relay settings need accuracy near the fault level |
Two cores in one body is the normal outcome: the metering core is sized on the light-load problem and the protection core on the fault problem, and neither can do the other's job. Ordering a single 100/5 0.5 class core and expecting it to trip a breaker is the most common specification error in this size range.
Where the chart is misread, and what it costs
Four mistakes account for most of the rework. Sizing from the transformer rating rather than the design current produces a ratio one or two steps too high, and the metering then reads 30–40% of rated current at full load, where a non-S class core has no guaranteed accuracy at night. Sizing from the design current alone, without the 1.2 factor, puts the core into saturation on every overload and clips the record during the event the utility wants recorded.
The third is quoting a rated output without adding the leads, which is invisible on the datasheet and shows up as a 0.5 class core behaving like a 1.0 class one. The fourth is treating the ALF as a fault-withstand figure: the core will not be damaged by a 25 kA fault, but the relay will not see 25 kA, and a high-set setting calculated on the assumption that it will is a setting that refuses to operate. In each case the cost is not the core, it is the re-test and the second outage, and on a transformer that feeds a hospital or a water works, the second outage is the one that gets escalated.
What to write into the RFQ and the datasheet
A CT enquiry that states these items comes back with a model and an outline drawing rather than a question sheet:
- System voltage and insulation level, and whether the core sits indoors in a metal-enclosed panel or outdoors.
- Design current and the basis for it: transformer rating, calculated load, or metered maximum demand.
- Ratio per core, in the form 100/5 A, with the number of cores and whether they are separate or combined in one body.
- Rated output per core, with the connected burden listed by device and the secondary lead length and cross-section.
- Class per core: 0.5S or 0.2S for metering, 5P20 or 10P20 for protection, or PX with a stated knee point where the scheme requires it.
- Prospective fault level at the installation point, so the ALF can be checked against it rather than assumed.
- Short-time thermal current and dynamic rating required, and the through-window or terminal dimensions available in the panel.
- Documents: routine test report, type test report to IEC 61869-2, outline drawing for approval, and the terminal marking convention.
Where Nahu Group Fits
Nahu Group makes epoxy-cast current transformers for indoor and outdoor medium voltage switchgear, in single, double and combined class bodies, with metering cores in 0.2S and 0.5S and protection cores in 5P and 10P. The range is on the current transformers product page, with the outdoor 35 kV body in the second photograph being the LZZBJ71-35 outdoor current transformer and the 10 kV body in the third being the LZZBJ9-10 indoor current transformer.
To get a configuration, send the system voltage, the design current with its basis, the ratio and class required per core, the rated output with the connected burden and lead length, the prospective fault level and the quantity. That is enough to return the model, the published accuracy data and an outline drawing for approval. If the ratio itself is still open, the steps behind it are worked through in the ratio selection walk-through, and the chart above then converts that decision into a core.
Where the core has to sit in a specific panel, the window or terminal geometry usually decides the body before the electrical parameters do. Send the panel drawing with the enquiry; a core that meets the chart on paper and does not fit the compartment costs a second order and a second outage.
Published Nov 25, 2026 · Nahu Group (NAHU Electric Technology)